Toshiba E6581830 Installation on inverter, Connection cable, Terminating resistor

Page 8

E658130

4. Installation on inverter

Refer to VF-S15 option adapter instruction manual (E6581838) for the installation on the inverter.

Mandatory

The following steps must be performed before installing.

1.Shut off all input power.

2.Wait at least 15 minutes and check to make sure that the charge lamp is no longer lit.

4.1. Connection cable

In the CC-Link system, use CC-Link dedicated cables.

If the cable used is other than the CC-Link dedicated cable, the performance of the CC-Link system is not guaranteed.

For the specifications of the CC-Link dedicated cable, refer to the website of the CC-Link Partner Association.

Website: http://www.cc-link.org/

Strip off the sheath of the CC-Link dedicated cable and wind wires to use. If the length of the sheath pealed is too long, a short circuit may occur among neighboring wires. If the length is too short, wires might come off.

Recommended screwdriverSmall flat-blade screwdriver

(Tip thickness: 0.4mm /tip width: 2.5mm)

Recommented tightening Torque0.22Nm to 0.25Nm

Cable stripping sizeAbout 7mm

mm

*Fix a cable so that a communication connector may be not taken the weight of wire. When the cable is not connected easily, the use of the following bar terminal is recommended.

Phoenix Contact Co. Ltd.

Bar terminal model: AI-TWIN2x0,5-8 WH

Length of bar terminal: 8mm

4.2. Terminating resistor

Connect the terminating resistor of 110Ω or 130Ω (CC-Link Ver.1.00 dedicated high performance cable.) between terminals at the end.

- 7 -

Image 8
Contents CCL003Z Introduction Handling in general Table of Contents Basic specifications OverviewCC-Link Version CC-Link VerSLD Names and functionsOutline Terminating resistor Installation on inverterConnection cable Connection of CC-Link master unit and inverter DA,DBMaximum connection number of units Page RUN LED indicatorRUN ERR Initial setting FunctionsCommunication parameters for CCL003Z C101CC-Link function setting Station number setting Baud rate settingCC-Link extended setting Run and frequency operation command Basic functionsMonitor Writing and reading the parameterI/O signal list One station is occupied CC-Link Ver.1 c122=0 RAMDouble setting is selected CC-Link Ver.2 c122=1 Quadruple setting is selected CC-Link Ver.2 c122=2Octuple setting is selected CC-Link Ver.2 c122=3 Trip history Detail of input and output signals RYnF Instruction code execution request120 OFF ST = on On ST = OFFRemote Register Assignment Instruction code 3 It is the same as instruction code 1 Monitor code RWwn is set Signal Description Instruction Codes 00EDH00FCH 00FDHEx A900 A900H, C123 C123H Details of an error code Fault record display example Description of reply code Reply codeDescription of monitor code Description of input terminal information Description of output terminal informationProgramming examples SB0 SW0RWr0 END Program example for reading the inverter statusX0F Program example for setting the operation mode Program example for setting the operation commands Program example for setting the running frequencyPLS SETProgram example for monitoring the output frequency Program example for parameter writing Program example for parameter reading Program example for trip information reading MOVProgram example for resetting the inverter at inverter error Instructions Unusual diagnosis Option errorDisconnection error of network cable How to check the error using the LEDs CPUCCL003Z Time Line ERR RUNTime Line RUNTime RUN ERR Line RUNERR Time RUN Time ERR