Setup Checklist

9101 Parts Included in Order

1.4 Setup Checklist

1.4.1 9101 Parts Included in Order

Allied Telesyn provides and ships certain parts with each order.

Table 1-4lists the items that are shipped with the 9101

Note: If any of these items are not included, contact your local Allied Telesyn representative

TABLE 1-4Part Checklist for 9101

Check

 

Item

Description

 

 

___

9101 Chassis

 

 

___

Brackets, Front Mount (2pcs) with screws for attaching brackets to chassis

 

 

___

Brackets, 19” to 23” Adapter (2pcs) with screws for attaching brackets to chassis

 

 

___

Fuses, 7.5A (4pcs); fuse holder (2pcs); DC Power Plug (1pc)

 

 

___

Shelf Mounting Kit, Metric, for attaching the chassis to a metric rack or cabinet (M6 screws)

 

 

___

Shelf Mounting Kit, Imperial, for attaching the chassis to an imperial rack or cabinet (#12-24

 

screws)

 

 

Table 1-5lists the items that are to be provided by the customer.

TABLE 1-5Customer Item Checklist

Item

Quantity

Description

 

 

 

MGMT

1

RJ-45, connectorized, Cat 5

cable

 

 

 

 

 

Power

As

Length determined by shelf position and how cabling is routed

Cabling

required

 

 

 

 

Voltmeter

1

Used to check the voltage at the terminal block

 

 

 

Console

1

RJ-45, connectorized, Cat 5

cable

 

Used to connect local PC/terminal for local interface (RS232). Refer to 1.12.

 

 

 

 

 

cable ties

As needed

n/a

 

 

 

1-6Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

Image 10
Contents Page Who Should Read This Guide? Reason for UpdateAbout this Guide Table of Contents Appendix Installation Overview for Allied Telesyn 9100 ConfigurationFollowing Procedures for the 9101, 9102, Selecting a Site for1 9101 Site Requirements 2Site Requirements for Allied Telesyn2 9102/9103 Site Requirements 3Site Requirements for Allied Telesyn 91029102/9103 Site Requirements Selecting a Site for 5Customer Item Checklist Setup Checklist4Part Checklist for 1 9101 Parts Included in Order7Part Checklist for 6Part Checklist for2 9102 / 9103 Parts Included in Order Shelf Mounting Options 8Customer Item Checklist1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 2 9102/3 Mounting Options 6Front Mount for 9102/37Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Wall Mounting Option OverviewInstalling the Wall Mount Allied Telesyn 9100 Installation SafetySafety Guidelines Safety Precautions While Working with Electricity Electrostatic DischargePrecautions and Conformance Standards Laser Safety Instructions Installing Power and Ground forPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground Connect the -48VDC office power supply to the 9101 PEM plug 129100 PEM plug with connections indicatedConnect to Power Source Single or Dual Apply and Check Power DC Power SupplyAlarm Connections 9101 Optional Apply and Check Power AC Power SupplyInstall Card Modules Install the CFC12Install the Service Module Install the SFP ModuleConfigure Local Terminal or PC Install Filler Plates FPF9Default Asynchronous Port Settings Option DefaultService Modules with RJ21connectors Connect System CablesSMs with Optical connectors SMs with RJ45 connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check software load Check the configurationCheck management interfaces Adding AC Power Module Allied Telesyn Contact InformationAppendix Glossary of TermsTelesyn 9100 Inventory Form 1Registration Information for the Telesyn