Data Management Cable (MGMT Port on CFC12) | Apply Power and Check Startup Sequence |
|
|
1.14 Apply Power and Check Startup Sequence
1.For the 9101, insert Fuse A and then Fuse B into the 9101 PEM.
2.For the 9102, set the AC Power Unit to the On position.
3.Observe that the fans should start and airflow should be begin through the unit.
4.Observe the startup sequence on the terminal interface, which should show the following:
Note: The startup sequence the user observes on the terminal may not exactly match the one illustrated below. However, it should be free from any error messages.
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
Allied Telesyn 12G Central Fabric Controller Boot Loader
Version 7.0.b.01.20050527
Created on Tue 05/31/2005 at 6:20p
Copyright Allied Telesyn Networks, Inc., 2004
VxWorks Version 5.5.1 for IBM PowerPC 440GP Rev. 2.0
BSP version 1.2/3
Copyright Wind River Systems, Inc.,
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
FPGA Version 12.11
Starting Allied Telesyn Product Software Loading.
Attaching to Flash File System ... done.
/tffs/ - Volume is OK
Press any key to stop automatic loading of software image...
0
Automatically loading software image...
Boot album is (current, attempt 1): '/tffs/load/cfc12_7.0.0.alpha.20050720.tar'
Checking Album's integrity...done
Loading vxWorks.bin.gz...(7998464 bytes)
Starting at 0x10000...
Attaching interface lo0...done
Adding 51113 symbols for standalone.
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
;@ @@@@@@@@@@@@@@@@@ ====
,;@@@@ @@@@@@@@@@@@@@" ========
;@@@@@@@@ @@@@@@@@" ,@ ========
,;@@@@@@@@@@@ @@@@@@@" ,@@@ ========
;@@@@@@@@@@@@@@@ @@@@;" ,@@@@@@ ====,
,;@@@@@@@@@@" ;@@@@@ @@" @@@@@@@@@@@@"
Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100) |