Allied Telesis 9102 Alarm Connections 9101 Optional, Apply and Check Power AC Power Supply

Page 27

Connect Power and Ground

Installing Power and Ground for the 9102

 

 

1.9 Installing Power and Ground for the 9102

1.9.1 Connect Power and Ground

The Allied Telesyn 9102 comes with a pre-installed AC power converter. (The 9103 comes with redundant AC power converters.) With 14 AWG grounding wire (green/yellow insulation), the user connects the ground stud at the rear of the unit to Frame ground. The user then connects the power cord from the AC power outlet to the AC power converter and then turns the AC power converter on.

The AC power converter is located at the rear of the unit, as shown in Figure 1-13.

FIGURE 1-139102 / 3 AC Power Converter (Rear of Unit)

1.9.2 Apply and Check Power (AC Power Supply)

1.Using 14 AWG grounding wire, connect the ground stud.

2.Ensure the power converter is in the Off position - Refer to Figure 1-13.

3.Using the power cord, connect the AC power unit to an AC power outlet.

4.Set the power converter in the On position - Refer to Figure 1-13

5.The fans will start to operate.

Note: Fan speed is self-regulating and will automatically adjust as necessary.

6.Set the power converter back to the Off position. The card modules are installed next.

1.10 Alarm Connections - 9101 (Optional)

Note: Connecting the alarm cables is optional. After initial system installation is complete, the user can return to this section and connect the alarm cables and configure the system alarms.

Two RJ-45 plugs are on the rear of the unit and are used as connecting cables for external alarms. Connect them as follows:

one RJ-45 used for alarm indicator input, into the ALM IN port

one RJ-45 used for the ALM OUT port as required.

Refer to the Allied Telesyn iMAP Component Specification for more information.

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-23

Image 27
Contents Page Reason for Update Who Should Read This Guide?About this Guide Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 1 9101 Parts Included in Order Setup Checklist4Part Checklist for 5Customer Item Checklist6Part Checklist for 7Part Checklist for2 9102 / 9103 Parts Included in Order 8Customer Item Checklist Shelf Mounting Options1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionAllied Telesyn 9100 Installation Safety Installing the Wall MountSafety Guidelines Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Installing Power and Ground for Laser Safety InstructionsPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectorsSMs with RJ45 connectors SMs with Optical connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check the configuration Check software loadCheck management interfaces Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form