Allied Telesis 9102, 9103, 9100, 9101 manual

Page 36

Apply Power and Check Startup Sequence

Data Management Cable (MGMT Port on CFC12)

@@@@@@@@@@@" "@@@@@ " @@@@@@@@@@@@@"

Allied Telesyn Networks, Inc.

Allied Telesyn 12G Central Fabric Controller

Version 7.0.0.ALPHA.20050720 (Lab-Only Build)

Created on Wed 07/20/2005 at 4:46a

Copyright Allied Telesyn Networks, Inc., 2004

----------------------------------------------

Software Version Information

----------------------------------------------

Build name

: Allied Telesyn 12G Central Fabric Controller

Build type

: Lab-Only Build

Revision

: 7.0.0.ALPHA.20050720

Built on

: Wed 07/20/2005 at 4:46a

Built by

: ccbuild

Environment: ccbuild_R7.0_nightly_integration

Baseline

: Integration Latest

Target

: cfc12

Options

:

----------------------------------------------

Boot ROM Version Information

----------------------------------------------

Boot ROM

:

Allied Telesyn 12G Central Fabric Controller Boot Loader

Revision

:

7.0.b.01.20050527

Built on

:

Tue 05/31/2005 at 6:20p

Built by

:

ssimmons

Environment:

ssimmons_R7.0_cfc12_fdb

Baseline

:

R7.0_Nightly_05_27_05.2360

BuildTarget: bootcfc12

----------------------------------------------

VxWorks Version 5.5.1 for IBM PowerPC 440GP Rev. 2.0

BSP version 1.2/3

Copyright Wind River Systems, Inc., 1984-2002

Memory Size: 255 MB

@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@

System Time is 2067-04-07 23:52:39.005

System initializing...User Access Verification

User Access Verification

Username:

5.The system will run initialization tests and end with the prompt Username:

6.Input a user ID of officer and a password of officer.

1-32Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

Image 36
Contents Page Reason for Update Who Should Read This Guide?About this Guide Table of Contents Appendix Installation Overview for Allied Telesyn 9100 ConfigurationFollowing Procedures for the 9101, 9102, Selecting a Site for1 9101 Site Requirements 2Site Requirements for Allied Telesyn2 9102/9103 Site Requirements 3Site Requirements for Allied Telesyn 91029102/9103 Site Requirements Selecting a Site for Setup Checklist 4Part Checklist for5Customer Item Checklist 1 9101 Parts Included in Order6Part Checklist for 7Part Checklist for2 9102 / 9103 Parts Included in Order 8Customer Item Checklist Shelf Mounting Options1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 2 9102/3 Mounting Options 6Front Mount for 9102/37Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Wall Mounting Option OverviewAllied Telesyn 9100 Installation Safety Installing the Wall MountSafety Guidelines Safety Precautions While Working with Electricity Electrostatic DischargePrecautions and Conformance Standards Installing Power and Ground for Laser Safety InstructionsPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground Connect the -48VDC office power supply to the 9101 PEM plug 129100 PEM plug with connections indicatedConnect to Power Source Single or Dual Apply and Check Power DC Power SupplyAlarm Connections 9101 Optional Apply and Check Power AC Power SupplyInstall Card Modules Install the CFC12Install the Service Module Install the SFP ModuleConfigure Local Terminal or PC Install Filler Plates FPF9Default Asynchronous Port Settings Option DefaultService Modules with RJ21connectors Connect System CablesSMs with RJ45 connectors SMs with Optical connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check the configuration Check software loadCheck management interfaces Adding AC Power Module Allied Telesyn Contact InformationAppendix Glossary of TermsTelesyn 9100 Inventory Form 1Registration Information for the Telesyn