Allied Telesis 9103, 9102, 9101 manual Installation Overview for, Allied Telesyn 9100 Configuration

Page 5

1.Installation of Allied Telesyn 9100

1.1Installation Overview for the 9100

1.1.1 Allied Telesyn 9100 Configuration

The Allied Telesyn™ 9100 is shelf mounted with one Central Fabric Controller (CFC12) and Service Modules (SMs) that depend on customer requirements. (Refer to the Allied Telesyn iMAP Component Specification for which SMs can be used.)

Table 1-1, Figure 1-1, and Figure 1-2show the Allied Telesyn 9100 components. Refer to these when perform- ing any task in this document.

The 9100 is offered in these versions:

1.The 9101-A has dual -48VDC power inputs.

2.The 9102-A has a non-redundant AC power supply.

3.The 9103-A has a redundant AC power supply.

TABLE 1-1Listing of components for the 9101 with slot/position and configuration notes

Ref.

Module

Configuration Notes

 

 

 

A

CFC12 - Slot 3

Always provisioned with the CFC12 card and always in slot 3

 

 

 

B

SM slots (0, 1, 2)

At least one is provisioned with an SM card

 

 

 

C

PEM (9101 only)

Power connections. Provides system power and grounding. Includes power feeds A and

 

 

B, ground, common return, and fuses A and B. Not on the 9102/3

 

 

 

D

Console

Provides local connection to PC (RS232)

 

 

 

E

MGMT

Provides connection to ethernet management port (100BaseT)

 

 

 

F

GE2RJ

Provides Fast Ethernet to a close proximity, lower data rate (100M) Ethernet, as well as

 

 

1000BaseT

 

 

 

G

GE4

Provides copper or fiber 1-Gigabit Ethernet uplink interface to WAN. Small Form Factor

 

 

Pluggable (SFP) modules are required

 

 

 

 

Back of 9101 unit:

Provides external system alarming functions. ALM IN port and ALM OUT port

 

ALM IN, ALM OUT

 

 

 

 

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-1

Image 5
Contents Page About this Guide Reason for UpdateWho Should Read This Guide? Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 4Part Checklist for Setup Checklist5Customer Item Checklist 1 9101 Parts Included in Order2 9102 / 9103 Parts Included in Order 6Part Checklist for7Part Checklist for 1 9101 Mounting Options 8Customer Item ChecklistShelf Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionSafety Guidelines Allied Telesyn 9100 Installation SafetyInstalling the Wall Mount Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Power and Grounding Cautions Installing Power and Ground forLaser Safety Instructions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectors13.4 GE4/FE2 SMs with RJ45 connectorsSMs with Optical connectors Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check management interfaces Check the configurationCheck software load Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form