Allied Telesis 9102 Shelf Mounting Options, 1 9101 Mounting Options, 8Customer Item Checklist

Page 12

Shelf Mounting Options

9101 Mounting Options

Table 1-8lists the items that are to be provided by the customer.

TABLE 1-8Customer Item Checklist

Item

Quantity

Description

 

 

 

OAM cable

1

RJ-45, connectorized, Cat 5

 

 

 

Power

1

Standard AC cable (3 prong)

Cabling

 

 

 

 

 

Console

1

RJ-45, connectorized, Cat 5

cable

 

Used to connect local PC/terminal for local interface (usually through an RJ-

 

 

 

 

45 to RS232 converter)

 

 

Note - so issue of line isolation resolved?

 

 

 

cable ties

As needed

n/a

 

 

 

1.5 Shelf Mounting Options

Three mounting options are available for the 9101; front, center, and wall.

Note: The wall mounting option is explained in a separate section, 1.6.

1.5.1 9101 Mounting Options

1.5.1.1 Front Mounting Option

The bracket is mounted on the front of the 9101 unit as illustrated in Figure 1-4.

1-8Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

Image 12
Contents Page Reason for Update Who Should Read This Guide?About this Guide Table of Contents Appendix Installation Overview for Allied Telesyn 9100 ConfigurationFollowing Procedures for the 9101, 9102, Selecting a Site for1 9101 Site Requirements 2Site Requirements for Allied Telesyn2 9102/9103 Site Requirements 3Site Requirements for Allied Telesyn 91029102/9103 Site Requirements Selecting a Site for Setup Checklist 4Part Checklist for5Customer Item Checklist 1 9101 Parts Included in Order6Part Checklist for 7Part Checklist for2 9102 / 9103 Parts Included in Order 8Customer Item Checklist Shelf Mounting Options1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 2 9102/3 Mounting Options 6Front Mount for 9102/37Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Wall Mounting Option OverviewAllied Telesyn 9100 Installation Safety Installing the Wall MountSafety Guidelines Safety Precautions While Working with Electricity Electrostatic DischargePrecautions and Conformance Standards Installing Power and Ground for Laser Safety InstructionsPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground Connect the -48VDC office power supply to the 9101 PEM plug 129100 PEM plug with connections indicatedConnect to Power Source Single or Dual Apply and Check Power DC Power SupplyAlarm Connections 9101 Optional Apply and Check Power AC Power SupplyInstall Card Modules Install the CFC12Install the Service Module Install the SFP ModuleConfigure Local Terminal or PC Install Filler Plates FPF9Default Asynchronous Port Settings Option DefaultService Modules with RJ21connectors Connect System CablesSMs with RJ45 connectors SMs with Optical connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check the configuration Check software loadCheck management interfaces Adding AC Power Module Allied Telesyn Contact InformationAppendix Glossary of TermsTelesyn 9100 Inventory Form 1Registration Information for the Telesyn