Allied Telesis 9102, 9103, 9100 1 9101 Site Requirements, 2Site Requirements for Allied Telesyn

Page 7

9101 Site Requirements

Selecting a Site for the 9100

1.3.1 9101 Site Requirements

The Allied Telesyn 9101 is installed in a environment that is affected by the existing installed equipment and the specific requirements of the Allied Telesyn 9101 shelf. Refer to Table 1-2.

TABLE 1-2Site Requirements for Allied Telesyn 9101

Type

Description

 

 

Access (for security reasons)

Installation in a restricted access location is preferred.

 

 

System Rear Access

Needed if the ALM IN and ALM OUT is going to be installed (during or

 

after initial installation).

 

 

Installation Placement

Placement: follow local cabling setup (from above, below, etc.)

 

Care should be taken not to compromise the stability of the rack by the

 

installation of this equipment.

 

Note: Due to weight limitations and the size of bundled cabling, 21 units can

 

physically be installed in a single 7 ft. telecom rack. However, the user

 

should verify that the floor loading for the rack, with the required number of

 

units installed, does not exceed the floor loading standard for the region or

 

country where the 9101(s) is being installed. 9101 installations inside the

 

U.S. would follow the Bellcore (Telcordia) floor loading standard of 114.7

 

lb. per square foot. See the Allied Telesyn Component Specification for the

 

NEBS specification.

 

 

Power Supply

Connect to a reliable grounded 48VDC source. The branch circuit overcur-

 

rent protection must be rated 15 amp maximum, following NEC require-

 

ments for permanent office equipment.

 

 

Spacing

Refer to Figure 1-3for installation spacing and numbers:

 

1. Mounting Width Aperture: 19.7 in (500 mm) min.

 

2. Aperture between mounting flanges:

 

- 17.5 in (442 mm) for all mounting options

 

3. Total Shelf Depth: 11.8 in (300 mm):

 

a. Door or cover: .4 in (10 mm) (Front and Back)

 

b. In front of Reference Plane for equipment (i.e. subracks): 1.6 in (41

 

mm)

 

c. Behind Reference Plane: 9.5 in (241 mm)

 

4. Rack Pitch (Midpoint to Midpoint of each chassis): 25.6 in (650 mm)

 

 

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-3

Image 7
Contents Page Who Should Read This Guide? Reason for UpdateAbout this Guide Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 1 9101 Parts Included in Order Setup Checklist4Part Checklist for 5Customer Item Checklist7Part Checklist for 6Part Checklist for2 9102 / 9103 Parts Included in Order Shelf Mounting Options 8Customer Item Checklist1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionInstalling the Wall Mount Allied Telesyn 9100 Installation SafetySafety Guidelines Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Laser Safety Instructions Installing Power and Ground forPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectorsSMs with Optical connectors SMs with RJ45 connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check software load Check the configurationCheck management interfaces Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form