Allied Telesis 9101, 9102, 9103 Allied Telesyn 9100 Installation Safety, Installing the Wall Mount

Page 19

Installing the Wall Mount

Allied Telesyn 9100 Installation Safety

Caution: The customer must ensure that the weight of a fully configured unit can be supported by the mounting hardware/support used with the brackets.

1.6.2 Installing the Wall Mount

1.Ensure there is enough space for the unit and associated cables

2.Screw the brackets to the sides of the unit using the screws supplied in the kit.

3.Locate and mark on the wall where the two holes where the top brackets will be mounted. Ensure the marks are horizontal.

4.Install two anchor screws/bolts, one for each top bracket.

5.Hang the unit from these anchors

6.Install the two bottom anchor screws/bolts, one through each bottom bracket.

7.Tighten all anchor screws/bolts and bracket screws.

1.7 Allied Telesyn 9100 Installation Safety

1.7.1 Safety Guidelines

Note: Only personnel familiar with local telco practices should install, replace, or service this equipment.

Note: Before starting the installation procedures, the user should read all of this section for important safety information and warnings.

Before installing and cabling the equipment, the user should be aware of standard safety practices and the hazards involved in working with electricity to avoid accidents. See the following section, Safety Guide- lines, for all cautions and warnings to insure that the installation is safe and free of hazards.

Before working on the equipment, the user should be aware of standard safety guidelines and the hazards involved in working with electricity to avoid accidents. Follow these guidelines and warnings and those located throughout this installation guide for a safe and hazard-free installation.

Follow these guidelines to ensure overall safety:

The user should keep all work areas clear and clean during and after installation.

The user should keep all tools away from walk areas where personnel could trip over them.

The user should not wear loose clothing that could catch on equipment. Secure any loose clothing.

The user should wear safety glasses if working under conditions that might be hazardous to eyes.

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-15

Image 19
Contents Page Who Should Read This Guide? Reason for UpdateAbout this Guide Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 1 9101 Parts Included in Order Setup Checklist4Part Checklist for 5Customer Item Checklist7Part Checklist for 6Part Checklist for2 9102 / 9103 Parts Included in Order Shelf Mounting Options 8Customer Item Checklist1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionInstalling the Wall Mount Allied Telesyn 9100 Installation SafetySafety Guidelines Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Laser Safety Instructions Installing Power and Ground forPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectorsSMs with Optical connectors SMs with RJ45 connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check software load Check the configurationCheck management interfaces Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form