Allied Telesis 9103, 9102 SMs with RJ45 connectors, SMs with Optical connectors, 13.4 GE4/FE2

Page 33

SMs with RJ45 connectors

Connect System Cables

1.13.2 SMs with RJ45 connectors

Attach the RJ45 end of the Ethernet cable to the specified port on the FE10 card.

FIGURE 1-18FE10 Cable Connector

Note: Each RJ45 cable connected to the FE10 card should be dressed neatly and tightly. Do not permit cables to loop.

FIGURE 1-19FE10 RJ45 Connector Dressing

1.13.3 SMs with Optical connectors

To Be Supplied

1.13.4 GE4/FE2

Note: The 9100 is equipped with 2 FE ports and 4 GE ports. The first FE or GE port can be used as the system uplink port. The other FE port or GE ports are used to support daisy-chaining. See the Allied Telesyn User Guide for more information.

1.Install the SFPs and attach the optical cable to the GE4 or connect the cable to the FE2 card.

2.Attach the other end of the cable to the uplink device.

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-29

Image 33
Contents Page Reason for Update Who Should Read This Guide?About this Guide Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 4Part Checklist for Setup Checklist5Customer Item Checklist 1 9101 Parts Included in Order6Part Checklist for 7Part Checklist for2 9102 / 9103 Parts Included in Order 8Customer Item Checklist Shelf Mounting Options1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionAllied Telesyn 9100 Installation Safety Installing the Wall MountSafety Guidelines Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Installing Power and Ground for Laser Safety InstructionsPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectorsSMs with RJ45 connectors SMs with Optical connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check the configuration Check software loadCheck management interfaces Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form