Allied Telesis 9101, 9103, 9100 manual 2 9102/3 Mounting Options, 6Front Mount for 9102/3

Page 15

9102/3 Mounting Options

Shelf Mounting Options

1.5.2 9102/3 Mounting Options

Because of the depth of the 9102/3 unit, there are adjustable bracket extensions, and attached to these extensions are the rear brackets.

Note: Regardless of the mounting option chosen, the rear brackets must be used.

1.5.2.1 Front Mounting Option

1.Place a bracket in the appropriate location as shown in Figure 1-6.

2.Using the M3 x 6mm screws, mount a front bracket.

3.Install a mounting bracket on the other side of the unit.

4.Install the extension brackets using M4 x 6mm screws. The extension bracket should be installed so that it is just in front of the rear mounting rail. (Refer to Figure 1-8.)

FIGURE 1-6Front Mount for 9102/3

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-11

Image 15
Contents Page Reason for Update Who Should Read This Guide?About this Guide Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 1 9101 Parts Included in Order Setup Checklist4Part Checklist for 5Customer Item Checklist6Part Checklist for 7Part Checklist for2 9102 / 9103 Parts Included in Order 8Customer Item Checklist Shelf Mounting Options1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionAllied Telesyn 9100 Installation Safety Installing the Wall MountSafety Guidelines Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Installing Power and Ground for Laser Safety InstructionsPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectorsSMs with RJ45 connectors SMs with Optical connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check the configuration Check software loadCheck management interfaces Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form