Allied Telesis 9103, 9102, 9100, 9101 manual Install the Service Module, Install the SFP Module

Page 29

Install the Service Module

Install Card Modules

 

 

FIGURE 1-15Detail of the card latch in Open Position (Card Below is Locked)

1.11.2 Install the Service Module

The Service Modules can be placed in any of slots 0, 1 and 2. It is recommended that the slots be filled in numer- ical order (0, then 1, then 2).

1.Take the card from its antistatic container.

2.For insertion into slots 0 or 2, hold the card securely with component side down. For insertion into slot 1, hold the card by its latches with component side up. (For any slot, the latch/label will go on the inside of the chas- sis).

3.Press the release buttons on the inside of the latches and push the latches out.

4.While holding the card, slowly but firmly push the card into the slot until the latches begin to engage the lock- ing rail.

5.Close the latches until the card locks into place.

1.11.3 Install the SFP Module

The Small Form Factor Pluggable module, which are inserted in the CFC12, can be ordered from your Allied Telesyn representative. Some have a bail latch.

Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

1-25

Image 29
Contents Page About this Guide Reason for UpdateWho Should Read This Guide? Table of Contents Appendix Allied Telesyn 9100 Configuration Installation Overview forSelecting a Site for Following Procedures for the 9101, 9102,2Site Requirements for Allied Telesyn 1 9101 Site Requirements3Site Requirements for Allied Telesyn 9102 2 9102/9103 Site Requirements9102/9103 Site Requirements Selecting a Site for 4Part Checklist for Setup Checklist5Customer Item Checklist 1 9101 Parts Included in Order2 9102 / 9103 Parts Included in Order 6Part Checklist for7Part Checklist for 1 9101 Mounting Options 8Customer Item ChecklistShelf Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 6Front Mount for 9102/3 2 9102/3 Mounting Options7Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Overview Wall Mounting OptionSafety Guidelines Allied Telesyn 9100 Installation SafetyInstalling the Wall Mount Electrostatic Discharge Safety Precautions While Working with ElectricityPrecautions and Conformance Standards Power and Grounding Cautions Installing Power and Ground forLaser Safety Instructions Connect Power and Ground Installing Power and Ground for Connect Power and Ground 129100 PEM plug with connections indicated Connect the -48VDC office power supply to the 9101 PEM plugApply and Check Power DC Power Supply Connect to Power Source Single or DualApply and Check Power AC Power Supply Alarm Connections 9101 OptionalInstall the CFC12 Install Card ModulesInstall the SFP Module Install the Service ModuleInstall Filler Plates FPF Configure Local Terminal or PCOption Default 9Default Asynchronous Port SettingsConnect System Cables Service Modules with RJ21connectors13.4 GE4/FE2 SMs with RJ45 connectorsSMs with Optical connectors Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check management interfaces Check the configurationCheck software load Allied Telesyn Contact Information Adding AC Power ModuleGlossary of Terms Appendix1Registration Information for the Telesyn Telesyn 9100 Inventory Form