Allied Telesis 9102, 9103, 9100, 9101 manual Install Card Modules, Install the CFC12

Page 28

Install Card Modules

Install the CFC12

1.11 Install Card Modules

1.11.1 Install the CFC12

Note: Do not attempt to install system cards without observing correct antistatic procedures. Failure to do so may damage cards.

1.Take the card from its antistatic container.

2.Hold the card securely with the lock-latch and label on the inside of the chassis. (Figure 1-15)

3.Press the release button on the inside of the latches and push the latches out. This puts the card in the open position. Refer to Figure 1-15.

FIGURE 1-14Latches in Open and Locked Position

4.Locate the slot (3) where the card is to be inserted.

5.While holding the latches/faceplate, slowly with a firm pressure push the card into the double slot until the latches begin to engage the locking rail. Refer to Figure 1-15.

Note: A firm pressure is required to seat the card. The lock-latch does not assist in seating the card.

6.Close the latches until they lock into place.(You do not need to press the release button while doing this.)

1-24Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)

Image 28
Contents Page Who Should Read This Guide? Reason for UpdateAbout this Guide Table of Contents Appendix Installation Overview for Allied Telesyn 9100 ConfigurationFollowing Procedures for the 9101, 9102, Selecting a Site for1 9101 Site Requirements 2Site Requirements for Allied Telesyn2 9102/9103 Site Requirements 3Site Requirements for Allied Telesyn 91029102/9103 Site Requirements Selecting a Site for Setup Checklist 4Part Checklist for5Customer Item Checklist 1 9101 Parts Included in Order7Part Checklist for 6Part Checklist for2 9102 / 9103 Parts Included in Order Shelf Mounting Options 8Customer Item Checklist1 9101 Mounting Options 4Front mount option for Shelf Mounting Options Center Mounting Option 2 9102/3 Mounting Options 6Front Mount for 9102/37Mid-Mount for 9102/3 Attaching the Extension Brackets and Rear Brackets Wall Mounting Option OverviewInstalling the Wall Mount Allied Telesyn 9100 Installation SafetySafety Guidelines Safety Precautions While Working with Electricity Electrostatic DischargePrecautions and Conformance Standards Laser Safety Instructions Installing Power and Ground forPower and Grounding Cautions Connect Power and Ground Installing Power and Ground for Connect Power and Ground Connect the -48VDC office power supply to the 9101 PEM plug 129100 PEM plug with connections indicatedConnect to Power Source Single or Dual Apply and Check Power DC Power SupplyAlarm Connections 9101 Optional Apply and Check Power AC Power SupplyInstall Card Modules Install the CFC12Install the Service Module Install the SFP ModuleConfigure Local Terminal or PC Install Filler Plates FPF9Default Asynchronous Port Settings Option DefaultService Modules with RJ21connectors Connect System CablesSMs with Optical connectors SMs with RJ45 connectors13.4 GE4/FE2 Data Management Cable Mgmt Port on CFC12 Apply Power and Check Startup Sequence Page Check software load Check the configurationCheck management interfaces Adding AC Power Module Allied Telesyn Contact InformationAppendix Glossary of TermsTelesyn 9100 Inventory Form 1Registration Information for the Telesyn