Allied Telesis
9102, 9103, 9100, 9101
manual
Installing Power and Ground for Connect Power and Ground
Install
Option Default
Configure Local Terminal or PC
Setup Checklist
SMs with RJ45 connectors
Checklist
Safety
Power and Grounding Cautions
Reason for Update
Page 24
Installing Power and Ground for the 9101
Connect Power and Ground
FIGURE
1-10
9101 power entry module (PEM)
The figure below details the 9100 PEM plug.
FIGURE
1-11
PEM Plug - Details
1-20
Telesyn 9100 Installation Guide (Installation of Allied Telesyn 9100)
Page 23
Page 25
Image 24
Page 23
Page 25
Contents
Page
Reason for Update
Who Should Read This Guide?
About this Guide
Table of Contents
Appendix
Installation Overview for
Allied Telesyn 9100 Configuration
Following Procedures for the 9101, 9102,
Selecting a Site for
1 9101 Site Requirements
2Site Requirements for Allied Telesyn
2 9102/9103 Site Requirements
3Site Requirements for Allied Telesyn 9102
9102/9103 Site Requirements Selecting a Site for
Setup Checklist
4Part Checklist for
5Customer Item Checklist
1 9101 Parts Included in Order
6Part Checklist for
7Part Checklist for
2 9102 / 9103 Parts Included in Order
8Customer Item Checklist
Shelf Mounting Options
1 9101 Mounting Options
4Front mount option for
Shelf Mounting Options Center Mounting Option
2 9102/3 Mounting Options
6Front Mount for 9102/3
7Mid-Mount for 9102/3
Attaching the Extension Brackets and Rear Brackets
Wall Mounting Option
Overview
Allied Telesyn 9100 Installation Safety
Installing the Wall Mount
Safety Guidelines
Safety Precautions While Working with Electricity
Electrostatic Discharge
Precautions and Conformance Standards
Installing Power and Ground for
Laser Safety Instructions
Power and Grounding Cautions
Connect Power and Ground
Installing Power and Ground for Connect Power and Ground
Connect the -48VDC office power supply to the 9101 PEM plug
129100 PEM plug with connections indicated
Connect to Power Source Single or Dual
Apply and Check Power DC Power Supply
Alarm Connections 9101 Optional
Apply and Check Power AC Power Supply
Install Card Modules
Install the CFC12
Install the Service Module
Install the SFP Module
Configure Local Terminal or PC
Install Filler Plates FPF
9Default Asynchronous Port Settings
Option Default
Service Modules with RJ21connectors
Connect System Cables
SMs with RJ45 connectors
SMs with Optical connectors
13.4 GE4/FE2
Data Management Cable Mgmt Port on CFC12
Apply Power and Check Startup Sequence
Page
Check the configuration
Check software load
Check management interfaces
Adding AC Power Module
Allied Telesyn Contact Information
Appendix
Glossary of Terms
Telesyn 9100 Inventory Form
1Registration Information for the Telesyn
Related pages
All Install page
Installation DU Telephone for Topcom Butler 3501
INSTALLATION for Aquacal 100
››Uninstall an application for Samsung GT-N8000EAABTU
20 Four-Port Ethernet Interface Installed in Slot for Cisco Systems 78-11180-01
Installing the Midrange for Orion Car Audio P5.2
Software Installation for Omega Vehicle Security OM-550
Install Battery for Sears 113.197411
Installation for Samsung GN641FFXD/BOL
Installing the Video-Card Heat Sink for Dell M6800
Special installation Horizontal connections for Pioneer 12
How do I properly assemble the Husqvarna 326P4 chainsaw?
Learn more
Top
Page
Image
Contents