Xantrex Technology 809-0912 manual Priority, Generator Soft Start

Page 41

FSequence IPM Owners Guide.book Page 31 Thursday, October 6, 2011 3:33 PM

 

Circuit Level Advanced Settings

Priority

toggled and the power manager starts to reconnect the AC relays that have

 

been set to Enabled. Freedom Sequence will sequentially start to reconnect

The Priority setting here is the same as the priority setting discussed in

all the load circuits in the priority order defined for AC relays.

“Circuit Priority” on page 17. The only difference here is that the change in

 

priority setting happens from the circuit-level screen in Advanced

EXCEPTION: If an AC load Circuit3 is set to a lower priority than an AC

Settings instead of from the Config screen.

load Circuit2 with a Generator Soft Start setting of Enabled,

 

Circuit3 will get disconnected to avoid a priority inversion1.

Generator Soft Start

The purpose of having a generator soft start (GEN Soft Start) feature is to allow generators to be loaded gradually after the transfer switch flips from shore power to generator or when the generator is started. Without engaging the GEN Soft Start feature, all the load circuits controlled by Freedom Sequence will abruptly get connected to generator power. This may cause the generator to experience a step load which may cause its voltage/ frequency to dip and in turn cause nuisance tripping of sensitive loads.

Each relay of Freedom Sequence that is associated to Line1 or Line2 can be

individually configured to two GEN Soft Start settings: Enabled or Disabled.

By default, all relays associated to Line1 or Line2 are set to Disabled.

When Freedom Sequence receives the Generator Run (B+) signal high, it will trigger the AC relays to disconnect load circuits that have GEN Soft Start configured to Enabled. For AC relays configured to Disabled, those AC relays will remain connected during the GEN Soft Start process. After the Generator Run (B+) signal goes high, Freedom Sequence will apply the Gen Warmup Delay. At the end of this Gen Warmup Delay,

GENERATOR IS OFF

 

E

GE

AC LOAD

PRIORITY GEN SOFT START

STATUS

 

R

N

Circuit1

[1]

Disabled

ON

H

O

 

S

 

 

Circuit2

[2]

Enabled

ON

 

 

 

 

 

 

Circuit3

[3]

Disabled

ON

 

 

 

 

 

 

 

DURING GEN WARM UP DELAY

 

E

GE

AC LOAD

PRIORITY

GEN SOFT START

STATUS

 

 

R

N

 

H

O

 

Circuit1

[1]

Disabled

ON

 

S

 

 

Circuit2

[2]

Enabled

OFF

 

 

 

 

 

 

 

 

Circuit3

[3]

Disabled

OFF

 

 

 

 

 

 

 

 

 

GENERATOR IS ON

 

E

GE

AC LOAD

PRIORITY GEN SOFT START

STATUS

 

 

R

N

 

H

O

 

Circuit1

[1]

Disabled

ON

 

S

 

 

 

 

 

 

Circuit2

[2]

Enabled

ON

 

 

 

 

 

 

 

 

Circuit3

[3]

Disabled

ON

 

 

 

 

 

 

 

 

 

 

 

 

 

Circuit3 will get disconnected to avoid tripping due to priority inversion.

Circuit2 will get reconnected first then Circuit3 follows, once the generator power has been fully ramped up and stabilized.

the Freedom Sequence power manager assumes the transfer switch has

1.A priority inversion occurs when an AC load that has a higher circuit priority gets disconnected first before another AC load that has a lower circuit priority.

 

 

975-0593-01-01

31

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Image 41
Contents Freedom Sequence Page Contact Information Purpose Conventions Used About This GuideRelated Information Reference Important Safety InstructionsExplosion Hazard Precautions When Placing the Power ManagerFCC Information to the User Risk of Damage to the Power ManagerContents Page Introduction Standard FeaturesMaterial List Product/Accessory Product Number Compatible Products and Accessories1Xanbus System Typical Xanbus System DiagramPorts and Terminals Mechanical FeaturesTypical RV Wiring Diagram With Freedom Sequence Typical RV WiringEnterFunc Power Manager ConfigurationPower Manager Configuration Cont Circuit StatusCircuit Status Circuit Status Config Basic Configuration SettingsList of configurable settings includes Priority List of circuit configurable settings includesCircuit Config Mode To change the Mode from the Device Status screenMode OperatingSHR BKR Mode Shore Breaker ModeAuto ManualShore Breaker Rating Breaker Ratings30.0A 25.0ARestore Defaults Restore DefaultsTo Restore Defaults from the Device Status screen Circuit Priority Circuit ConfigurationConfig Circuit Config Circuit Config To change the priority setting from the Device Status screenLoad Shed EnabledTo change the Load Shed from the Device Status screen Load ShedImproper Configuration DUE to Lack of Experience Advanced SettingsBKR Derating List of advanced settings includeAdvanced Settings Breaker Derating Config Advanced SettingsGEN Warmup Delay Generator Warmup DelayGenerator Breaker Rating Screen10sec Connect Sequence DelayConnect Seq Delay AC Disc Priority AC Disqualification Priority12.0V DC Voltage SettingNom DC Voltage Circuit Name Circuit Level Advanced SettingsCircuit2 DC Relay Settings AC Relay SettingsCircuit3 Circuit NameAC Line Circuit TypeGenerator Soft Start PriorityReconnect Margin Battery Voltage TriggersAuto-Detection of AC Input Source Shore/Gen Freedom Sequence Operational ConceptsAuto-Detection of AC Input Source Type 1-Ph/2-Ph Loading of Shore/Generator Breaker RatingsAC Load Shedding LINE1 L1 LINE2 L2 DC Load Shedding Using DC Relay to control AC load circuitsPriority Swapping Between Circuits Override the AC Circuit Load Shedding Generator Run Detection B+ Signal Battery Voltage MeasurementFreedom Sequence Interaction with Other Xanbus Devices Freedom SW Interactive Charger De-rating ICDFreedom Sequence SCP Menu Map Specifications Warranty Warranty and Return InformationWarranty and Return Information Product DisclaimerReturn Procedure Return Material Authorization PolicyOut of Warranty Service Information About Your System Page Xantrex Technology USA Inc