Installation |
| 5 |
| “Easy Install” Layout |
|
| Not to scale; | Alternate Installation |
| wiring omitted | for a Shallow Sump |
Upper Discharge pipe | for clarity. |
|
| Switch with Clamp*## |
|
Hose Coupling with Clamps* |
|
|
Discharge pipe cutoff piece
|
|
|
|
| |
| Close Nipple* |
| Teflon tape all | ||
|
| ||||
|
|
| threaded joints | ||
| |||||
|
|
| |||
|
| Check Valve | Battery Back Up | ||
|
| Assembly* | |||
Auxiliary Check Valve* |
| Sump Pump* | |||
|
|
| |||
|
|
|
|
| |
(See Important Check Valve |
|
|
|
|
|
Warranty Note, Below) |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
Bushing* † |
|
|
|
|
|
Primary Pump Discharge |
|
|
|
|
|
Pipe (cut to fit) |
|
|
|
|
|
Primary Sump Pump |
|
|
|
|
|
IMPORTANT CHECK VALVE/WARRANTY NOTE: |
| ||||
Check Valve |
| ||||
Flow Arrow; Must point | Check Valve Flapper(s) must swing in direction shown. |
| |||
Flow arrow(s) must point AWAY from pump being protected. |
| ||||
AWAY from Pump being |
| ||||
|
|
|
|
| |
Protected | The |
| |||
|
| ||||
Primary Sump Pump | as shown or the warranty is void. Do not use a wrench (see |
| |||
Discharge Port | Installation Step 4, Page 4)! If the Primary Sump Pump |
| |||
| does not have a check valve installed as shown below the |
| |||
| Tee, the Auxiliary Check Valve must be installed as shown |
| |||
| or the warranty is void. |
|
| ||
|
|
|
|
|
|
Notes:
*Supplied with the Battery Backup System.
†Use if necessary to adapt a
#Use to adapt the auxiliary check valve to the discharge pipe.
##Water level when the switch shuts off must be above the BBU pump intake.
5763 0108
Figure 2: Typical Installation Layouts
For parts or assistance, call Simer Customer Service at