Simer Pumps A5000-04 owner manual BBU Wiring and Setup, Mark joints for gluing

Page 6

Installation

6

9.Study the assembly in the pit for a moment and then adjust it so that nothing interferes with the primary pump or its switch. Mark the joints with a permanent marker so that you can realign everything after you pull it out of the pit for gluing (see Figure 3).

NOTE: Take your time with this - it takes care but isn’t very difficult. Be sure you leave enough room for the BBU pump’s vertical switch. Mark everything that might move!

10.After you have marked everything, remove the assembly from the pit.

11.Cut off the vertical discharge pipe at the cut point

you marked in Step 8. BE SURE YOU ARE CUTTING ON THE RIGHT MARK!

12.Recheck the alignment and glue up all the joints on the primary pump assembly.

NOTE: You may need to support the assembly, which won’t balance very well, in order to preserve the alignment while gluing it. Check this before you start gluing. Another pair of hands may help here!

13.After the glue has set, slide the hose coupling and its clamps down over the assembled discharge pipe. If the pipe is 1-1/4”, be sure to use the two reducing inserts included with the coupling.

14.Hook the switch clamp over the switch bracket and slide the assembly down over the hose coupling and discharge pipe. Clamp the switch so that the water level when the switch shuts off is above the BBU pump’s intake.

15.Replace the assembly in the pit, slide the hose coupling up over the air gap so that it joins the pipes, and tighten the clamps enough to keep it there.

Figure 3: Mark joints for gluing

16.Check fit, alignment, etc. If everything looks good, make sure that the BBU vertical switch is at the right height and free of obstructions, then tighten the hose clamps on the coupling.

17.Adjust the rod stop location on the BBU float rod to give the desired switch travel. If necessary, nip off the bottom of the float rod to provide clearance.

BBU WIRING AND SETUP

See Figures 4, 5, and 6 for battery installation and connection information.

Battery

Inputs

5768 0108

Figure 4: The battery input is inside the battery case. Support the case when opening it. The support must be at least 4” thick.

Figure 5: Install the battery in the case. Have someone support the case while you do this. Once the battery is in the case, connect the leads from the charger/controller: +(Red) to +(Red), and –(Black) to –(Black).

For parts or assistance, call Simer Customer Service at 1-800-468-7867 /1-800-546-7867

Image 6
Contents Llame al A5000-04Call 800This is the safety alert symbol. When you see this SafetyRead and Follow Safety Instructions General InformationInstallation Required Battery CapacityBasic Tools Materials Needed BBU Installation Instructions InstallationEasy Install Layout BBU Wiring and Setup Mark joints for gluingThermal Runaway Condition Wrong Battery VoltageReversed Battery Connections Charge Time Monitor 1Troubleshooting Battery RequirementsBattery Maintenance Table I Battery Capacity CalculationAC power Table III LED Function Displays LEDs Lighted ContinuouslyTable V Control Button Functions Table IV Error Code Displays LEDs FlashingPump status Charging AC power Battery status Control Button Result of Pushing ButtonRepair Parts Part Description Part NumberLire ET Observer LES Instructions DE Sécurité Voici le symbole indiquant quil faut être prudentSécurité Renseignements GénérauxOutils ET Fournitures DE Base Dont on Aura Besoin Capacité requise des batteriesMontage Étudier la pour les montages suggérésInstallation Câblage ET Montage DU Système DE Secours À Batterie Repérer les raccords pour les collerBranchements de la batterie inversés DEL affichées et touches de commande Tableau II, III, IV etRemèdes possibles Claquage thermiqueRecherche DES Pannes Critères DE LA BatterieEntretien DE LA Batterie Tableau 1 Calcul de la capacité de la batterieDEL des codes de fonctionnement Tableau III DEL des fonctions les DEL restent alluméesTableau V Fonctions des touches de contrôle Charging Charge AC power Battery status État de la batterieTableau IV Codes d’erreurs Les DEL clignotent Touches de contrôle RésultatPièces de rechange Réf Désignation des pièces Numéro des piècesInformación General Seguridad¡LEA Y Siga LAS Instrucciones DE Seguridad Este es el símbolo de alerta de seguridad. CuandoHerramientas Y Materiales Básicos Requeridos InstalaciónInstalación Y Operación Capacidad requerida de la bateríaInstrucciones DE Instalación DE LA BBU InstalaciónConfiguración de Fácil instalación Easy Install Layout Cableado Y Configuración DE LA BBU Figura 3 Marcar las uniones para encolarConexiones de la batería invertidas Posibles recursosTensión de la batería incorrecta Monitor de tiempo de carga 1 yLocalización DE Fallas Requisitos DE LA BateríaMantenimiento DE LA Batería Cuadro I Cálculo de la capacidad de la bateríaEstado de operación del sistema DEL de control Iluminación continua indica operación normalCorriente CA Cuadro V Funciones de los botones de controlSystem Alert Alerta del sistema Botón de control Resultado cuando se oprime el botónPiezas de repuesto Clave Número Descripción de la pieza De la pieza