Simer Pumps 2806E owner manual Electrical, Motor Switch Settings, Dial Type Voltage Selector

Page 7

Electrical

7

 

 

Disconnect power before working on pump, motor, pressure switch, or wiring..

Motor Switch Settings

NOTICE: 1/2 HP motors are dual voltage and are factory set to 115 V. Motor terminal board (located under the motor end cover) should look like that shown below. Use the instructions to set your motor to match your power source.

Never connect a motor set to 115 V to a 230 V power source.

Dial Type Voltage Selector

Voltage is set to 230 volts. To change to 115 volts:

Power Supply Connections

Voltage

Change

Dial

Pressure Switch

Ground Wire Connection

Figure 4: Voltage set to 230 volts, Dial Type

1.Make sure power is off.

2.Turn the dial counter-clockwise until 115 shows in the dial window as shown in Figure 5.

Figure 5: Voltage set to 115 volts, Dial Type

3.Attach the incoming power leads to the two outer screws on the pressure switch as shown in Figure 4.

4.Attach the ground wire to the grounding connections as shown in Figure 4.

5.If there are other wires, they should be capped.

6.Reinstall the motor end and pressure switch covers.

Hazardous voltage.. Can shock, burn, or kill. Connect ground wire before connecting power supply wires. Use the wire size (including the ground wire) specified in the wiring chart. If possible, connect the pump to a separate branch circuit with no other appliances on it.

Explosion hazard.. Do not ground to a gas

supply line.

Wiring Connections

Fire hazard.. Incorrect voltage can cause a fire or seriously damage the motor and voids the warranty. The supply voltage must be within ±10% of the motor nameplate voltage.

NOTICE: Dual-voltage motors may be set for 115 V or 230 V. If necessary, reset the motor to the desired voltage, as shown. Do not alter the wiring in single voltage motors.

Install, ground, wire, and maintain your pump in compliance with the National Electrical Code (NEC) or the Canadian Electrical Code (CEC), as applicable, and with all local codes and ordinances that apply. Consult your local building inspector for code information.

Connection Procedure:

1.Connect the ground wire first as shown in Figure 4. The ground wire must be a solid copper wire at least as large as the power supply wires.

2.There must be a solid metal connection between the pressure switch and the motor for motor grounding protection. If the pressure switch is not connected to the motor, connect the green ground screw in the switch to the green ground screw under the motor end cover. Use a solid copper wire at least as large as the power supply wires.

3.Connect the ground wire to a grounded lead in a service panel, to a metal underground water pipe, to a metal well casing at least ten feet (3 m) long, or to a ground electrode provided by the power company or the hydro authority.

4.Connect the power supply wires to the pressure switch as shown in Figure 4.

You have just completed the wiring for your pump. Please go to Priming for startup preparations.

For parts or assistance, call Simer Customer Service at 1-800-468-7867

Image 7
Contents Pages Call Composer le 1 800Pages Español General Safety SafetyImportant Safety Instructions Electrical SafetyGeneral Terms and Conditions Limitation of Remedies WarrantyExceptions to the Twelve 12 Month Limited Warranty Sewage PumpsReplacing An Old Pump InstallationMajor Components What They Do Horizontal Piping from Well to PumpCased Well Installation, 2 or Larger Casing Figure Well Point Driven Point Installation FigureTank Pre-Charge Discharge Pipe and Pressure Tank ConnectionsTank Pumping Cycle Dial Type Voltage Selector Motor Switch SettingsWiring Connections ElectricalPriming Wiring Chart Recommended Wire and Fuse SizesElectrical Priming Winterize Preparing to Start the PumpSymptom Possible Causes Corrective Action TroubleshootingPart Description Part Number Repair PartDescription Qty Sécurité générale SécuritéDirectives de sécurité importantes Sécurité concernant l’électricitéModalités générales et restriction des recours GarantiePompes d’eaux d’égout Exceptions à la garantie limitée de douze 12 moisTuyauterie horizontale entre le puits et la pompe Principaux composants et fonctions de ceux-ciPas à Installation de la pointe filtrante FigurePrécharge du réservoir Branchements du tuyau de refoulementCycle de pompage du réservoir Réglages de l’interrupteur du moteur ÉlectricitéSélecteur de tension à cadran Connexions des filsHivérisation de la pompe Électricité Amorçage HivérisationPréparations avant le démarrage de la pompe AmorçageSymptômes Causes probables Remèdes Diagnostic des pannesRéf Désignation des pièces No.. des pièces Pièces de rechangeRéf Désignation Qté Pièces de rechangeSeguridad general SeguridadInstrucciones importantes de seguridad Seguridad electricaTérminos y condiciones generales Limitación de recursos GarantíaBombas cloacales Excepciones para la garantía limitada de doce 12 mesesReemplazo de una bomba vieja InstalaciónComponentes principales y sus funciones Tubería horizontal desde el pozo a la bombaEscala Instalacion del punto del pozo punto de hincarCiclo de bombeo del tanque Precarga del tanqueConexiones de los cables Configuraciones del interruptor del motorElectricidad Selector de tensión de tipo cuadrante14/14 2/2 12/14 3.3/2 10/14 5.5/2 10/12 5.5/3.3 Preparación para arrancar la bomba Pozo profundoCebado Preparación de la bomba para el inviernoSíntoma Causas probables Acción correctiva Localización de fallasDescripción de la pieza No.. de la pieza Piezas de repuestoDescripción de la pieza Cant Piezas de repuesto