HP xw2x220c Blade manual Environmental requirements

Page 24

90º access with one door closed

120º access with both doors open

Front door clearance for 10000 Series Racks configured with 24-in baying brackets is:

102º access with one door closed

Environmental requirements 24

Image 24
Contents HP BladeSystem c-Class Site Planning Guide Intended audience Contents Conversion factors and formulas Technical support Introduction About this documentRelated documentation General site preparation guidelines Ashrae guidelines for site planningHP site planning assistance Site planning considerations Computer room preparationPage Air conditioning system specifications Basic air distribution systemsCabling requirements Air conditioning ductsFloor loading Raised floor loadingAverage floor loading Computer room safety Installation and maintenance precautionsFire protection Fire suppressionWorking space for component access Lighting requirements for equipment servicingEnvironmental requirements Environmental elementsHumidity level Dust and pollutionMetallic particulate contamination Acoustic noise specification Electrostatic discharge preventionRecommended operating environment AshraeAirflow requirements Space requirementsBlanking panels HP Rack Airflow Optimization KitDelivery space requirements Operational space requirementsEquipment clearance and floor loading Floor plan grid Rack and accessory footprints HP BladeSystem enclosure environmental specificationsFront door clearance Environmental requirements Environmental requirements Best practices for deployment in rows Rack placement and arrangement for proper airflow Third-party racksRack tie-down option kit Power requirements and considerations Power requirementsElectrical factors Power consumption Electrical load requirements circuit breaker sizing Power quality Power considerationsFactors affecting power quality Power system protectionPower options Power redundancyNon-redundant power Wire selectionDistribution hardware Line voltage selectionGrounding requirements Grounding systemsRaceway systems electrical conduits Lahj Building distributionPower distribution safety grounding Lahj Power panel groundComputer safety ground Dual power source groundingCabinet performance grounding high frequency ground Raised floor high-frequency noise groundingSystem installation guidelines Wiring connectionsEquipment grounding implementation details Power configuration Dynamic Power CappingHP BladeSystem enclosure single-phase power configuration Data communications cablesPower requirements and considerations Power requirements and considerations Power requirements and considerations PDU installation C7000 PDU exampleC3000 PDU example HP BladeSystem c7000 Enclosure three-phase AC configuration HP BladeSystem enclosure DC power configuration HP BladeSystem c7000 Enclosure DC configurationPower supply specifications Single-phase HP 2250W Power Supply specificationHP BladeSystem c3000 Enclosure DC configuation Specification Value Specification Value DC power supply specification Hardware specifications and requirements Enclosure specificationsHP BladeSystem c7000 Enclosure specifications HP BladeSystem c3000 Enclosure specificationsHP 10000 G2 rack specifications Rack requirementsRack-free environment requirements Configuration scenarios Example configurationsExample minimum configuration Example typical configurationExample maximum configuration Estimating power and cooling Estimating total weight Preparing for installation Preparing for installation General component placement guidelines Additional rack considerationsRack configuration software Sample installation schedule Sample checklistsIs there a completed floor plan? Delivery survey Page Conversion factors and formulas Conversion factorsFormulas Technical support Before you contact HPHP contact information Acronyms and abbreviations UPS Apparent power GlossaryKVA Index Site planning assistance from HP