HP
xw2x220c Blade
manual
Power requirements and considerations
Specs
Install
Wire selection
Power configuration
Rack and accessory footprints
Checklist
Weight
Safety
Power requirements
Page 40
•
HP BladeSystem c3000 Enclosure
•
HP BladeSystem c3000 Tower Enclosure
Power requirements and considerations 40
Page 39
Page 41
Image 40
Page 39
Page 41
Contents
HP BladeSystem c-Class Site Planning Guide
Intended audience
Contents
Conversion factors and formulas
Technical support
About this document
Introduction
Related documentation
Ashrae guidelines for site planning
General site preparation guidelines
HP site planning assistance
Site planning considerations
Computer room preparation
Page
Air conditioning system specifications
Basic air distribution systems
Cabling requirements
Air conditioning ducts
Raised floor loading
Floor loading
Average floor loading
Computer room safety
Installation and maintenance precautions
Fire protection
Fire suppression
Working space for component access
Lighting requirements for equipment servicing
Environmental requirements
Environmental elements
Humidity level
Dust and pollution
Metallic particulate contamination
Acoustic noise specification
Electrostatic discharge prevention
Recommended operating environment
Ashrae
Airflow requirements
Space requirements
Blanking panels
HP Rack Airflow Optimization Kit
Operational space requirements
Delivery space requirements
Equipment clearance and floor loading
Floor plan grid
Rack and accessory footprints
HP BladeSystem enclosure environmental specifications
Front door clearance
Environmental requirements
Environmental requirements
Best practices for deployment in rows
Rack placement and arrangement for proper airflow
Third-party racks
Rack tie-down option kit
Power requirements
Power requirements and considerations
Electrical factors
Power consumption
Electrical load requirements circuit breaker sizing
Power quality
Power considerations
Factors affecting power quality
Power system protection
Power options
Power redundancy
Non-redundant power
Wire selection
Distribution hardware
Line voltage selection
Grounding requirements
Grounding systems
Raceway systems electrical conduits Lahj
Building distribution
Power distribution safety grounding Lahj
Power panel ground
Computer safety ground
Dual power source grounding
Cabinet performance grounding high frequency ground
Raised floor high-frequency noise grounding
Wiring connections
System installation guidelines
Equipment grounding implementation details
Power configuration
Dynamic Power Capping
HP BladeSystem enclosure single-phase power configuration
Data communications cables
Power requirements and considerations
Power requirements and considerations
Power requirements and considerations
PDU installation
C7000 PDU example
C3000 PDU example
HP BladeSystem c7000 Enclosure three-phase AC configuration
HP BladeSystem enclosure DC power configuration
HP BladeSystem c7000 Enclosure DC configuration
Single-phase HP 2250W Power Supply specification
Power supply specifications
HP BladeSystem c3000 Enclosure DC configuation
Specification Value
Specification Value
DC power supply specification
Hardware specifications and requirements
Enclosure specifications
HP BladeSystem c7000 Enclosure specifications
HP BladeSystem c3000 Enclosure specifications
HP 10000 G2 rack specifications
Rack requirements
Rack-free environment requirements
Configuration scenarios
Example configurations
Example minimum configuration
Example typical configuration
Example maximum configuration
Estimating power and cooling
Estimating total weight
Preparing for installation
Preparing for installation
General component placement guidelines
Additional rack considerations
Rack configuration software
Sample installation schedule
Sample checklists
Is there a completed floor plan?
Delivery survey
Page
Conversion factors
Conversion factors and formulas
Formulas
Before you contact HP
Technical support
HP contact information
Acronyms and abbreviations
UPS
Apparent power
Glossary
KVA
Index
Site planning assistance from HP
Top
Page
Image
Contents