HP xw2x220c Blade manual Technical support, Before you contact HP, HP contact information

Page 67

Technical support

Before you contact HP

Be sure to have the following information available before you call HP:

Technical support registration number (if applicable)

Product serial number

Product model name and number

Product identification number

Applicable error messages

Add-on boards or hardware

Third-party hardware or software

Operating system type and revision level

HP contact information

For the name of the nearest HP authorized reseller:

See the Contact HP worldwide (in English) webpage

(http://welcome.hp.com/country/us/en/wwcontact.html).

For HP technical support:

In the United States, for contact options see the Contact HP United States webpage (http://welcome.hp.com/country/us/en/contact_us.html). To contact HP by phone:

o Call 1-800-HP-INVENT (1-800-474-6836). This service is available 24 hours a day, 7 days a week. For continuous quality improvement, calls may be recorded or monitored.

o If you have purchased a Care Pack (service upgrade), call 1-800-633-3600. For more information about Care Packs, refer to the HP website (http://www.hp.com/hps).

In other locations, see the Contact HP worldwide (in English) webpage (http://welcome.hp.com/country/us/en/wwcontact.html).

Technical support 67

Image 67
Contents HP BladeSystem c-Class Site Planning Guide Intended audience Contents Conversion factors and formulas Technical support About this document IntroductionRelated documentation Ashrae guidelines for site planning General site preparation guidelinesHP site planning assistance Computer room preparation Site planning considerationsPage Basic air distribution systems Air conditioning system specificationsAir conditioning ducts Cabling requirementsRaised floor loading Floor loadingAverage floor loading Fire suppression Computer room safetyInstallation and maintenance precautions Fire protectionLighting requirements for equipment servicing Working space for component accessDust and pollution Environmental requirementsEnvironmental elements Humidity levelMetallic particulate contamination Electrostatic discharge prevention Acoustic noise specificationAshrae Recommended operating environmentHP Rack Airflow Optimization Kit Airflow requirementsSpace requirements Blanking panelsOperational space requirements Delivery space requirementsEquipment clearance and floor loading Floor plan grid HP BladeSystem enclosure environmental specifications Rack and accessory footprintsFront door clearance Environmental requirements Environmental requirements Best practices for deployment in rows Third-party racks Rack placement and arrangement for proper airflowRack tie-down option kit Power requirements Power requirements and considerationsElectrical factors Power consumption Electrical load requirements circuit breaker sizing Power system protection Power qualityPower considerations Factors affecting power qualityPower redundancy Power optionsLine voltage selection Non-redundant powerWire selection Distribution hardwareBuilding distribution Grounding requirementsGrounding systems Raceway systems electrical conduits LahjDual power source grounding Power distribution safety grounding LahjPower panel ground Computer safety groundRaised floor high-frequency noise grounding Cabinet performance grounding high frequency groundWiring connections System installation guidelinesEquipment grounding implementation details Data communications cables Power configurationDynamic Power Capping HP BladeSystem enclosure single-phase power configurationPower requirements and considerations Power requirements and considerations Power requirements and considerations C7000 PDU example PDU installationC3000 PDU example HP BladeSystem c7000 Enclosure three-phase AC configuration HP BladeSystem c7000 Enclosure DC configuration HP BladeSystem enclosure DC power configurationSingle-phase HP 2250W Power Supply specification Power supply specificationsHP BladeSystem c3000 Enclosure DC configuation Specification Value Specification Value DC power supply specification HP BladeSystem c3000 Enclosure specifications Hardware specifications and requirementsEnclosure specifications HP BladeSystem c7000 Enclosure specificationsRack requirements HP 10000 G2 rack specificationsRack-free environment requirements Example typical configuration Configuration scenariosExample configurations Example minimum configurationExample maximum configuration Estimating power and cooling Estimating total weight Preparing for installation Preparing for installation Additional rack considerations General component placement guidelinesRack configuration software Sample checklists Sample installation scheduleIs there a completed floor plan? Delivery survey Page Conversion factors Conversion factors and formulasFormulas Before you contact HP Technical supportHP contact information Acronyms and abbreviations UPS Glossary Apparent powerKVA Index Site planning assistance from HP