Lennox International Inc MERIT SERIES GAS FURNACE DOWNFLOW AIR DISCHARGE, ML193DF Exhaust

Page 25

WALL TERMINATION KITS (CLOSE−COUPLE) EXTENDED VENT FOR GRADE CLEARANCE 2 inch (51 mm) 22G44 (US)

3 inch (76 mm) 44J40 (US)

If intake and exhause pipe is less than 12 in. (305 mm) above snow accumulation or other obstructions, field−

fabricated piping must be installed.FIELD−PROVIDED REDUCER MAY BE REQUIRED TO ADAPT

8” (203 mm) Min. for 2” (51 mm) & 3” (76 mm) DIA. pipe between the end of the exhaust pipe and intake pipe

WALL SUPPORT*

12” (305 mm) Max. for 2” (51 mm) Dia. Exhaust

LARGER VENT PIPE SIZE TO TERMINATION

 

20” (508 mm) Max. for 3” (76 mm) Dia. Exhaust

 

12”

 

 

 

 

 

 

 

 

 

 

(305 mm)

 

6” (152 mm)

 

EXHAUST

 

 

1/2” (13 mm)

 

AIR

 

 

FOAM INSULATION

Maximum

 

 

 

 

 

 

 

 

(Field Furnished)

 

 

 

INTAKE

 

 

INTAKE

 

 

AIR

 

EXHAUST

AIR

 

 

 

 

AIR

 

 

 

5” (127 mm)

 

 

 

8” (203 mm) Min.

12” (305 mm) Minimum

 

12” (305 mm) Minimum

 

Above Grade or Average

5−1/2”

Above Grade or Average

 

 

 

 

Snow Accumulation

 

Snow Accumulation

 

 

 

(140 mm)

 

 

GRADE

 

GRADE

 

12” (305 mm) Max. for 2” (51 mm) Dia. Exhaust

*Use wall support every 24" (610). Use two supports if

 

20” (508 mm) Max. for 3” (76 mm) Dia. Exhaust

extension is greater than 24" but less than 48".

 

 

 

 

FIGURE 35

WALL TERMINATION KITS (CLOSE−COUPLE) EXTENDED VENT FOR GRADE CLEARANCE 2 inch (51 mm) 30G28 (WTK Canada)

3 inch (76 mm) 81J20 (WTK Canada)

See Installation Instructions for additional information.

If intake and exhause pipe is less than 12 in. (305 mm) above snow accumulation or other obstructions, field− fabricated piping must be installed.

FIELD−PROVIDED

REDUCER MAY BE REQUIRED TO ADAPT LARGER VENT PIPE SIZE TO TERMINATION

WALL SUPPORT*

12” (305 mm) Max. for 2” (51 mm) Dia. Exhaust

 

20” (508 mm) Max. for 3” (76 mm) Dia. Exhaust

6” (152 mm)

EXHAUST

AIR

Maximum

 

6” (152 mm)

INTAKE

Minimum

AIR

INTAKE

 

AIR

5” (127 mm)

 

6” (152 mm)

12” (305 mm) Minimum

Minimum

Above Grade or Average

 

Snow Accumulation

 

GRADE

12”

(305 mm)

1/2” (13 mm)

FOAM INSULATION

(Field Furnished)

EXHAUST

AIR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12” (305 mm) Minimum

 

 

 

 

5−1/2”

 

 

 

 

 

 

 

 

 

 

 

Above Grade or Average

 

 

 

(140 mm)

 

 

 

 

Snow Accumulation

 

 

 

 

 

 

GRADE

12” (305 mm) Max. for 2” (51 mm) Dia. Exhaust

*Use wall support every 24" (610). Use two supports if

20” (508 mm) Max. for 3” (76 mm) Dia. Exhaust

extension is greater than 24" but less than 48".

FIGURE 36

Page 25

Image 25
Contents Table of Contents Installation Instructions ML193DFML193DF ML193DF Unit Dimensions − inches mmML193DF Parts Arrangement BAG AssemblyControl BOX Blower MotorDirect Vent Installation NON−DIRECT Vent Safety InformationML193DF Gas Furnace Shipping and Packing ListUse of Furnace as Construction Heater Combustion, Dilution & Ventilation Air GeneralEquipment in Confined Space − ALL AIR from Inside Equipment in Confined Space − ALL AIR from Outside Shipping Bolt RemovalSetting Equipment Installation − Setting EquipmentFront Horizontal Back NC‡ NON−COMBUSTIBLE Floor Opening SizeSide View Combustible Flooring Base Opening Size− Seal the cabinet and check for air leaks Piping and Fittings Specifications Pipe & Fittings SpecificationsFilters Duct SystemOutdoor Termination Kits Usage Venting Practices Joint Cementing ProcedurePiping Suspension Guidelines ScheduleMinimum Vent Pipe Lengths Vent Piping GuidelinesML193DF MIN. Vent Length Model Maximum Allowable Intake or Exhaust Vent Length in Feet Typical Intake Pipe Connections Typical Exhaust Pipe ConnectionsIntake Exhaust Typical AIR Intake Pipe Connections Inches 305mm or 12 in mm Inside Corner DetailUS Installations1 Canadian Installations2 Direct Vent Roof Termination KIT − On field supplied terminations, a minimum distanceFLUSH−MOUNT Side Wall Termination KIT 51W11 51mm 76mm Vent Pipe Required to Adapt Reducer MAY beUnconditioned Space SupportTop View Front ViewExhaust NON−DIRECT Vent Roof Termination KIT 203mm − 305mmML193DF NON−DIRECT Vent Application Using Existing Chimney To drain ML193DF with Evaporator CoilTrap / Drain Assembly Using 1/2 PVC or 3/4 PVC Furnace Isolate GAS Valve Gas PipingGAS Pipe Capacity − FT3/HR kL/HR Electrical Precautions and ProceduresElectrostatic Discharge ESD Interior MAKE−UP BOX FACTORY− Installed Left Side MAKE−UPExterior MAKE−UP BOX BOX InsideThermostat Designations Typical ML193DF Field Wiring DiagramTypical ML193DF Wiring Diagram Unit Start−Up For Your Safety Read Before OperatingIntegrated Control Automatic Hot Surface Ignition SystemPage GAS Meter Clocking Chart Gas Pressure AdjustmentProper Combustion High Altitude Information2286m 3048m 2286 − 3038m73W37 73W81 68W68 74W90 74W91 69W73 Heat FAN-OFF Time in Seconds Other Unit AdjustmentsNo Jumper High Low In. w.g Cfm Watts Cfm Watts cfm Watts Blower DataElectrical SHOCK, Fire Or Explosion Hazard ServicePage Ignition Control Board Diagnostic Codes Planned ServiceDiagnostic Codes LED #1 Red LED #2 GreenNormal Heating Mode Abnormal Heating Mode Troubleshooting Heating Sequence of OperationHeating Sequence of Operation Heating Sequence Normal Cooling Mode Abnormal Cooling Mode Troubleshooting Cooling Sequence of OperationCooling Sequence of Operation Continuous Heat Speed FAN Sequence of Operation Troubleshooting Continuous Fan Sequence of OperationRepair Parts List GAS Supply Start−Up & Performance Check ListReturn AIR Duct System Supply AIR Duct Intake / Exhaust PipeTotal External Static Drain Line Temperature RiseCondensate Line Thermostat Vent PipeLY BELOW. Keep Clear of ALL OBSTRUC- Tions Requirements for Commonwealth of Massachusetts