Lennox International Inc MERIT SERIES GAS FURNACE DOWNFLOW AIR DISCHARGE, ML193DF

Page 37

Placing the furnace into operation:

ML193DF units are equipped with an automatic hot sur- face ignition system. Do not attempt to manually light burners on this furnace. Each time the thermostat calls for heat, the burners will automatically light. The ignitor does not get hot when there is no call for heat on these units.

Priming Condensate Trap

The condensate trap should be primed with water prior to start−up to ensure proper condensate drainage. Either pour 10 fl. oz. (300 ml) of water into the trap, or follow these steps to prime the trap:

1 − Follow the lighting instructions to place the unit into op- eration.

2 − Set the thermostat to initiate a heating demand.

3 − Allow the burners to fire for approximately 3 minutes.

4 − Adjust the thermostat to deactivate the heating de- mand.

5 − Wait for the combustion air inducer to stop. Set the thermostat to initiate a heating demand and again al- low the burners to fire for approximately 3 minutes.

6 − Adjust the thermostat to deactivate the heating de- mand and wait for the combustion air inducer to stop. At this point, the trap should be primed with sufficient water to ensure proper condensate drain operation.

WARNING

If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or death.

Gas Valve Operation (Figure 54)

1 − STOP! Read the safety information at the beginning of this section.

2 − Set the thermostat to the lowest setting.

3 − Turn off all electrical power to the unit.

4 − This furnace is equipped with an ignition device which automatically lights the burners. Do not try to light the burners by hand.

5 − Remove the upper access panel.

6 − Move gas valve switch to OFF. See figure 54.

7 − Wait five minutes to clear out any gas. If you then smell gas, STOP! Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instruc- tions. If you do not smell gas go to next step.

8 − Move gas valve switch to ON. See figure 54.

9 − Replace the upper access panel.

10− Turn on all electrical power to to the unit. 11− Set the thermostat to desired setting.

NOTE − When unit is initially started, steps 1 through 11 may need to be repeated to purge air from gas line.

MANIFOLD

MANIFOLD

PRESSURE

PRESSURE

ADJUSTMENT

OUTLET

SCREW

 

INLET

 

PRESSURE

 

PORT

GAS VALVE SHOWN IN ON POSITION

FIGURE 54

12− If the appliance will not operate, follow the instructions urning Off Gas to Unit" and call your service techni- cian or gas supplier.

Turning Off Gas to Unit

1 − Set the thermostat to the lowest setting.

2 − Turn off all electrical power to the unit if service is to be performed.

3 − Remove the upper access panel.

4 − Move gas valve switch to OFF.

5 − Replace the upper access panel. Failure To Operate

If the unit fails to operate, check the following:

1 − Is the thermostat calling for heat?

2 − Are access panels securely in place?

3 − Is the main disconnect switch closed?

4 − Is there a blown fuse or tripped breaker?

5 − Is the filter dirty or plugged? Dirty or plugged filters will cause the limit control to shut the unit off.

6 − Is gas turned on at the meter?

7 − Is the manual main shut-off valve open?

8 − Is the internal manual shut-off valve open?

9 − Is the unit ignition system in lockout? If the unit locks out again, inspect the unit for blockages.

Heating Sequence Of Operation

1 − When thermostat calls for heat, combustion air inducer starts.

2 − Combustion air pressure switch proves blower opera- tion. Switch is factory−set and requires no adjustment.

3 − After a 15−second prepurge, the hot surface ignitor en- ergizes.

4 − After a 20−second ignitor warm−up period, the gas valve solenoid opens. A 4−second Trial for Ignition peri- od begins."

5 − Gas is ignited, flame sensor proves the flame, and the combustion process continues.

6 − If flame is not detected after first ignition trial, the igni- tion control will repeat steps 3 and 4 four more times before locking out the gas valve (ATCHGUARD" flame failure mode). The ignition control will then auto- matically repeat steps 1 through 6 after 60 minutes. To interrupt the 60−minute ATCHGUARD" period, move thermostat from to then back to

Heat". Heating sequence then restarts at step 1.

Page 37

Image 37
Contents Table of Contents Installation Instructions ML193DFML193DF ML193DF Unit Dimensions − inches mmML193DF Parts Arrangement BAG AssemblyControl BOX Blower MotorDirect Vent Installation NON−DIRECT Vent Safety InformationML193DF Gas Furnace Shipping and Packing ListUse of Furnace as Construction Heater Combustion, Dilution & Ventilation Air GeneralEquipment in Confined Space − ALL AIR from Inside Equipment in Confined Space − ALL AIR from Outside Shipping Bolt RemovalSetting Equipment Installation − Setting EquipmentFront Horizontal Back NC‡ NON−COMBUSTIBLE Floor Opening SizeSide View Combustible Flooring Base Opening Size− Seal the cabinet and check for air leaks Piping and Fittings Specifications Pipe & Fittings SpecificationsFilters Duct SystemOutdoor Termination Kits Usage Venting Practices Joint Cementing ProcedurePiping Suspension Guidelines ScheduleMinimum Vent Pipe Lengths Vent Piping GuidelinesML193DF MIN. Vent Length Model Maximum Allowable Intake or Exhaust Vent Length in Feet Typical Intake Pipe Connections Typical Exhaust Pipe ConnectionsIntake Exhaust Typical AIR Intake Pipe Connections Inches 305mm or 12 in mm Inside Corner DetailUS Installations1 Canadian Installations2 Direct Vent Roof Termination KIT − On field supplied terminations, a minimum distanceFLUSH−MOUNT Side Wall Termination KIT 51W11 51mm 76mm Vent Pipe Required to Adapt Reducer MAY beUnconditioned Space SupportTop View Front ViewExhaust NON−DIRECT Vent Roof Termination KIT 203mm − 305mmML193DF NON−DIRECT Vent Application Using Existing Chimney To drain ML193DF with Evaporator CoilTrap / Drain Assembly Using 1/2 PVC or 3/4 PVC Furnace Isolate GAS Valve Gas PipingGAS Pipe Capacity − FT3/HR kL/HR Electrical Precautions and ProceduresElectrostatic Discharge ESD Interior MAKE−UP BOX FACTORY− Installed Left Side MAKE−UPExterior MAKE−UP BOX BOX InsideThermostat Designations Typical ML193DF Field Wiring DiagramTypical ML193DF Wiring Diagram Unit Start−Up For Your Safety Read Before OperatingIntegrated Control Automatic Hot Surface Ignition SystemPage GAS Meter Clocking Chart Gas Pressure AdjustmentProper Combustion High Altitude Information2286m 3048m 2286 − 3038m73W37 73W81 68W68 74W90 74W91 69W73 Heat FAN-OFF Time in Seconds Other Unit AdjustmentsNo Jumper High Low In. w.g Cfm Watts Cfm Watts cfm Watts Blower DataElectrical SHOCK, Fire Or Explosion Hazard ServicePage Ignition Control Board Diagnostic Codes Planned ServiceDiagnostic Codes LED #1 Red LED #2 GreenNormal Heating Mode Abnormal Heating Mode Troubleshooting Heating Sequence of OperationHeating Sequence of Operation Heating Sequence Normal Cooling Mode Abnormal Cooling Mode Troubleshooting Cooling Sequence of OperationCooling Sequence of Operation Continuous Heat Speed FAN Sequence of Operation Troubleshooting Continuous Fan Sequence of OperationRepair Parts List GAS Supply Start−Up & Performance Check ListReturn AIR Duct System Supply AIR Duct Intake / Exhaust PipeTotal External Static Drain Line Temperature RiseCondensate Line Thermostat Vent PipeLY BELOW. Keep Clear of ALL OBSTRUC- Tions Requirements for Commonwealth of Massachusetts