Lennox International Inc installation instructions ML193DF with Evaporator Coil, To drain

Page 28

5 − If unit will be started immediately upon completion of installation, prime trap per procedure outlined in Unit Start−Up section.

Condensate line must slope downward away from the trap to drain. If drain level is above condensate trap, condensate pump must be used. Condensate drain line should be routed within the conditioned space to avoid freezing of condensate and blockage of drain line. If this is not possible, a heat cable kit may be used on the condensate trap and line. Heat cable kit is avail- able from Lennox in various lengths; 6 ft. (1.8m) − kit no. 26K68; 24 ft. (7.3m) − kit no. 26K69; and 50 ft. (15.2m) − kit no. 26K70.

CONDENSATE TRAP LOCATION

(shown with right side exit of condensation)

ML193DF with Evaporator Coil

Field−Provided Vent

 

 

 

 

 

 

Condensate trap and

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

evaporator coil must drain

 

 

 

 

 

 

 

separately as shown.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Trap can be installed a

maximum of 5 ft. from furnace.

(*PVC Only)

1" min.

5’ max.

Field Provided Vent

min. 1" Above

Condensate Drain

FIGURE 44

CAUTION

Do not use copper tubing or existing copper condensate lines for drain line.

CAUTION

to drain

*Piping from furnace must slope down a minimum of 1/4" per ft. toward trap.

FIGURE 43

A separate drain line must be run to the drain from the condensate trap to ensure proper drainage and pressure switch operation. DO NOT connect the condensate trap drain into the drain line from the evaporator coil.

Page 28

Image 28
Contents Installation Instructions ML193DF Table of ContentsML193DF Unit Dimensions − inches mm ML193DFBAG Assembly ML193DF Parts ArrangementControl BOX Blower MotorSafety Information Direct Vent Installation NON−DIRECT VentML193DF Gas Furnace Shipping and Packing ListUse of Furnace as Construction Heater General Combustion, Dilution & Ventilation AirEquipment in Confined Space − ALL AIR from Inside Shipping Bolt Removal Equipment in Confined Space − ALL AIR from OutsideSetting Equipment Installation − Setting EquipmentFront Horizontal Back NON−COMBUSTIBLE Floor Opening Size NC‡Side View Combustible Flooring Base Opening Size− Seal the cabinet and check for air leaks Pipe & Fittings Specifications Piping and Fittings SpecificationsFilters Duct SystemOutdoor Termination Kits Usage Joint Cementing Procedure Venting PracticesPiping Suspension Guidelines ScheduleMinimum Vent Pipe Lengths Vent Piping GuidelinesML193DF MIN. Vent Length Model Maximum Allowable Intake or Exhaust Vent Length in Feet Typical Intake Pipe Connections Typical Exhaust Pipe ConnectionsIntake Exhaust Typical AIR Intake Pipe Connections Inside Corner Detail Inches 305mm or 12 in mmUS Installations1 Canadian Installations2 Direct Vent Roof Termination KIT − On field supplied terminations, a minimum distanceFLUSH−MOUNT Side Wall Termination KIT 51W11 51mm 76mm Vent Pipe Reducer MAY be Required to AdaptUnconditioned Space SupportFront View Top ViewExhaust 203mm − 305mm NON−DIRECT Vent Roof Termination KITML193DF NON−DIRECT Vent Application Using Existing Chimney ML193DF with Evaporator Coil To drainTrap / Drain Assembly Using 1/2 PVC or 3/4 PVC Gas Piping Furnace Isolate GAS ValveGAS Pipe Capacity − FT3/HR kL/HR Electrical Precautions and ProceduresElectrostatic Discharge ESD FACTORY− Installed Left Side MAKE−UP Interior MAKE−UP BOXExterior MAKE−UP BOX BOX InsideTypical ML193DF Field Wiring Diagram Thermostat DesignationsTypical ML193DF Wiring Diagram For Your Safety Read Before Operating Unit Start−UpIntegrated Control Automatic Hot Surface Ignition SystemPage Gas Pressure Adjustment GAS Meter Clocking ChartProper Combustion High Altitude Information2286m 3048m 2286 − 3038m73W37 73W81 68W68 74W90 74W91 69W73 Heat FAN-OFF Time in Seconds Other Unit AdjustmentsNo Jumper Blower Data High Low In. w.g Cfm Watts Cfm Watts cfm WattsService Electrical SHOCK, Fire Or Explosion HazardPage Planned Service Ignition Control Board Diagnostic CodesDiagnostic Codes LED #1 Red LED #2 GreenNormal Heating Mode Abnormal Heating Mode Troubleshooting Heating Sequence of OperationHeating Sequence of Operation Heating Sequence Normal Cooling Mode Abnormal Cooling Mode Troubleshooting Cooling Sequence of OperationCooling Sequence of Operation Troubleshooting Continuous Fan Sequence of Operation Continuous Heat Speed FAN Sequence of OperationRepair Parts List Start−Up & Performance Check List GAS SupplyReturn AIR Duct System Supply AIR Duct Intake / Exhaust PipeTemperature Rise Total External Static Drain LineCondensate Line Thermostat Vent PipeRequirements for Commonwealth of Massachusetts LY BELOW. Keep Clear of ALL OBSTRUC- Tions