Electrical work

The electrical work should be performed by a specialist qualified for the work.

ffUse the three phase power supply, and be sure to install the sub power distributing board for exclusive use with the unit (separately purchased by the user).

❋❋Avoid multiple connecting wiring as it can cause a drop in voltage, thus resulting in poor performance of the automatic control circuit.

ffBe sure to install circuit breaker (separately purchased by the user). ffBe sure to connect the grounding wire.

 

 

 

Power supply cords of parts of appliances for outdoor use shall not be lighter than polychloroprene sheathed flexible

 

 

 

cord. (Code designation IEC:60245 IEC 66 / CENELEC:H07RN-F)

NOTE

 

1.Remove the screw on the electrical component box and remove the cover plate.

2.Route the connection cord through the side of the indoor unit and connect the cable to terminals.

3.Route the other end of the cable to the outdoor unit through the ceiling & the hole on the wall.

4.Reassemble the electrical component box cover, carefully tightening the screw.

Wiring standard

 

Model

AP50M0Series / AP50M1Series

Power

 

 

3N~, 380-415V, 50Hz

Circuit breaker

 

 

Earth leakage circuit breaker(ELCB) 30A

Electric wire

 

Below 20m

2.5mm2

 

Below 50m

4mm2

 

 

Allowable voltage

342~457V

Min. size of electric wires from/to the

Below 20m : 0.75mm2

indoor/outdoor units

Over 20m : 1mm2

You must compress the solderless ring to the cable and then connect it to the main power terminal. CAUTION • Solderless ring selection

Silver solder

Thickness of cable (mm2)

B (mm)

d2 (mm)

 

 

 

2.5

Less than 9.5

More than 4.5

 

 

 

4

Less than 9.5

More than 4.5

 

 

 

NOTE

34

This equipment complies with IEC 61000-3-12 provided that the short-circuit power Ssc is greater than or equal to Ssc (*2) at the interface point between the user's supply and the public system. It is the responsibility of the installer or user of the equipment to ensure, by consultation with the distribution network operator if necessary, that the equipment is connected only to a supply with a short-circuit power Ssc greater than or equal to Ssc(*2).

[Ssc (*2)]

MODEL

Ssc[MVA]

 

 

AP50M0AXXSG

0.528

 

 

AP50M1AXXSG

0.528

 

 

Mirage_AP50M0@_IBIM_EN_05323A-02.indd 34

2016-05-19 오후 1:27:21

Image 34
Contents Air Conditioner Thank you for purchasing this Samsung productStrong Turbo/Long Function Features of your new air conditionerLook for Everywhere Contents Important safety symbols and precautions Safety precautionsDo not yank the power cable with hands Ensure no water gets into the air conditioner FfPotential risk of personal injury Use a rated circuit breaker onlyFfPotential risk of injury or electric shock Do not open the front panel during operationFfInsufficient ventilation may result in poor performance Do not allow children to climb on the air conditionerFfPotential risk of personal injury or property loss FfWearing thick gloves can protect your hands Main parts Viewing your air conditionerChecking the indoor unit and display To open the panelControl panel Heater and Purity function is not supported by this modelChecking the remote controller Remote controller buttonsUsing the remote controller Remote controller displayAre in the same space Inserting the batteries Battery changing timeStoring the remote controller Indoor unitBasic operation Adjusting the desired temperature Turning on the powerSelecting the operation mode Selecting the fan speedSelecting air flow direction You cannot set the fan speed when setting the On timer Setting the On/Off timerWhen the air conditioner is off Controller displayWhen the air conditioner is on ButtonUsing the Turbo function When the air conditioner is operating in Cool or Heat modeUsing the Long function Locking the control panelUsing the air conditioner with the control panel Cleaning the exterior Cleaning and maintaining the air conditionerCleaning the filter Air filter Maintaining your air conditioner Installation partPeriodical checks Have deposited at low temperatures Internal protections via the unit control systemTroubleshooting AppendixOperation ranges HumidityGeneral information Installing the unitOr accessing its internal components PersonnelMake sure that you earth the cables Power supply line, fuse or circuit breakerDo not install the air conditioner in following places Complete, electric shock or fire may occurAccessory parts list Top view Selection of installation placeIndoor unit Side viewOutdoor unit Selecting appropriate location for installation Preparing the installationVentilate Space requirements Wear protective goggles and mask before sprayingCord. Code designation IEC60245 IEC 66 / CENELECH07RN-F Wiring standardElectrical work Ssc *2Using 4poles ELCBEarth Leakage Circuit Breaker Indoor and outdoor connection wiringAP50M0 Series Using 3poles Elcb and 2poles Elcb AP50M1 SeriesElectrical wiring Connecting the power terminalWhen using the rubber leg Installation methodOutdoor unit When using the anchor bolt Installation proceduresTrap Oil trap Check the following list and install an oil trapRefrigerant pipe work Insulating the pipes FfRadius of curvature R on the oil trap are as followsRemove burr on the edge of pipe Cut the pipe using the pipe cutterConnection of refrigerant piping Flare processing It may cause explosion and injuryTightening of connection parts Pipe bendingDrilling a hole in the wall Fixing the indoor unit Wall installation Corner InstallationDrain hose ExampleAir purge Be sure that all valve cocks are closedRefrigerant charging How to add refrigerantCheck the stability of the pressure for 10 minutes Check Check and test operationIs grounding properly made? When the outdoor temperature is below zero, do not Pump down procedure When removing the productTest operation Packing and unpacking guide Outdoor unit Prepare the following tools How to connect your extended power cablesMm of the wire shields of the tube TubeFfMethod Apply heat to the contraction tube to contract itMirageAP50M0@IBIMEN05323A-02.indd 2016-05-19 오후 English Questions or COMMENTS?