Samsung AP50M1ANXSG, AP50M0ANXSG manual Check and test operation, Is grounding properly made?

Page 46

Check and test operation

Check

ffBe sure to check the following again after completion of installation. 1. Check the piping connection area for any gas leakage.

Indoor connection area

Outdoor connection area

2. Is the drain hose properly connected?

3. Is the insulation of the piping in good condition?

Pipe insulator (Over 7mm foamed polyethylene or EPDM foam)

Pipie connection part insulator (Over 5mm foamed polyethylene)

4. Is grounding properly made?

More than 30cm

46

Mirage_AP50M0@_IBIM_EN_05323A-02.indd 46

2016-05-19 오후 1:27:28

Image 46
Contents Air Conditioner Thank you for purchasing this Samsung productStrong Turbo/Long Function Features of your new air conditionerLook for Everywhere Contents Important safety symbols and precautions Safety precautionsDo not yank the power cable with hands Ensure no water gets into the air conditioner FfPotential risk of personal injury Use a rated circuit breaker onlyFfPotential risk of injury or electric shock Do not open the front panel during operationFfInsufficient ventilation may result in poor performance Do not allow children to climb on the air conditionerFfPotential risk of personal injury or property loss FfWearing thick gloves can protect your hands Main parts Viewing your air conditionerChecking the indoor unit and display To open the panelControl panel Heater and Purity function is not supported by this modelChecking the remote controller Remote controller buttonsUsing the remote controller Remote controller displayAre in the same space Inserting the batteries Battery changing timeStoring the remote controller Indoor unitBasic operation Adjusting the desired temperature Turning on the powerSelecting the operation mode Selecting the fan speedSelecting air flow direction You cannot set the fan speed when setting the On timer Setting the On/Off timerWhen the air conditioner is off Controller displayWhen the air conditioner is on ButtonUsing the Turbo function When the air conditioner is operating in Cool or Heat modeUsing the Long function Locking the control panelUsing the air conditioner with the control panel Cleaning the exterior Cleaning and maintaining the air conditionerCleaning the filter Air filter Maintaining your air conditioner Installation partPeriodical checks Have deposited at low temperatures Internal protections via the unit control systemTroubleshooting AppendixOperation ranges HumidityGeneral information Installing the unitOr accessing its internal components PersonnelMake sure that you earth the cables Power supply line, fuse or circuit breakerDo not install the air conditioner in following places Complete, electric shock or fire may occurAccessory parts list Top view Selection of installation placeIndoor unit Side viewOutdoor unit Selecting appropriate location for installation Preparing the installationVentilate Space requirements Wear protective goggles and mask before sprayingCord. Code designation IEC60245 IEC 66 / CENELECH07RN-F Wiring standardElectrical work Ssc *2Using 4poles ELCBEarth Leakage Circuit Breaker Indoor and outdoor connection wiringAP50M0 Series Using 3poles Elcb and 2poles Elcb AP50M1 SeriesElectrical wiring Connecting the power terminalWhen using the rubber leg Installation methodOutdoor unit When using the anchor bolt Installation proceduresTrap Oil trap Check the following list and install an oil trapRefrigerant pipe work Insulating the pipes FfRadius of curvature R on the oil trap are as followsRemove burr on the edge of pipe Cut the pipe using the pipe cutterConnection of refrigerant piping Flare processing It may cause explosion and injuryTightening of connection parts Pipe bendingDrilling a hole in the wall Fixing the indoor unit Wall installation Corner InstallationDrain hose ExampleAir purge Be sure that all valve cocks are closedRefrigerant charging How to add refrigerantCheck the stability of the pressure for 10 minutes Check Check and test operationIs grounding properly made? When the outdoor temperature is below zero, do not Pump down procedure When removing the productTest operation Packing and unpacking guide Outdoor unit Prepare the following tools How to connect your extended power cablesMm of the wire shields of the tube TubeFfMethod Apply heat to the contraction tube to contract itMirageAP50M0@IBIMEN05323A-02.indd 2016-05-19 오후 English Questions or COMMENTS?