Samsung AP50M0ANXSG, AP50M1ANXSG manual FfMethod, Apply heat to the contraction tube to contract it

Page 51

4.Using a crimping tool, compress the two points and flip it over and compress another two points in the same location. -- The compression dimension should be 8.0.

-- After compressing it, pull both sides of the wire to make sure it is firmly pressed.

Compression

ffMethod 1

ffMethod 2

dimension

Compress it 4 times.

Compress it 4 times.

 

5 mm

5 mm

5.Wrap it with the insulation tape twice or more and position your contraction tube in the middle of the insulation tape. A total of three or more layers of insulation is required.

 

ffMethod 1

ffMethod 2

 

 

Insulation tape

Insulation tape

 

 

40 mm

35 mm

 

 

 

 

6.

Apply heat to the contraction tube to contract it.

Contraction tube

 

 

 

7.

After tube contraction work is completed, wrap it with the insulation tape to

Insulation tape

 

finish.

 

 

 

 

• Make sure that the connection parts are not exposed to outside.

CAUTION • Be sure to use insulation tape and a contraction tube made of approved reinforced insulating materials that have the same level of withstand voltage with the power cable. (Comply with the local regulations on extensions.)

• In case of extending the electric wire, please DO NOT use a round-shaped pressing socket. WARNING -- Incomplete wire connections can cause electric shock or a fire.

ENGLISH

51

Mirage_AP50M0@_IBIM_EN_05323A-02.indd 51

2016-05-19 오후 1:27:30

Image 51
Contents Thank you for purchasing this Samsung product Air ConditionerFeatures of your new air conditioner Strong Turbo/Long FunctionLook for Everywhere Contents Safety precautions Important safety symbols and precautionsDo not yank the power cable with hands Ensure no water gets into the air conditioner Do not open the front panel during operation Use a rated circuit breaker onlyFfPotential risk of injury or electric shock FfPotential risk of personal injuryDo not allow children to climb on the air conditioner FfInsufficient ventilation may result in poor performanceFfPotential risk of personal injury or property loss FfWearing thick gloves can protect your hands To open the panel Viewing your air conditionerChecking the indoor unit and display Main partsHeater and Purity function is not supported by this model Control panelRemote controller buttons Checking the remote controllerRemote controller display Using the remote controllerAre in the same space Indoor unit Battery changing timeStoring the remote controller Inserting the batteriesBasic operation Selecting the fan speed Turning on the powerSelecting the operation mode Adjusting the desired temperatureSelecting air flow direction Controller display Setting the On/Off timerWhen the air conditioner is off You cannot set the fan speed when setting the On timerButton When the air conditioner is onWhen the air conditioner is operating in Cool or Heat mode Using the Turbo functionLocking the control panel Using the Long functionUsing the air conditioner with the control panel Cleaning and maintaining the air conditioner Cleaning the exteriorCleaning the filter Air filter Installation part Maintaining your air conditionerPeriodical checks Internal protections via the unit control system Have deposited at low temperaturesAppendix TroubleshootingHumidity Operation rangesPersonnel Installing the unitOr accessing its internal components General informationComplete, electric shock or fire may occur Power supply line, fuse or circuit breakerDo not install the air conditioner in following places Make sure that you earth the cablesAccessory parts list Side view Selection of installation placeIndoor unit Top viewOutdoor unit Preparing the installation Selecting appropriate location for installationVentilate Wear protective goggles and mask before spraying Space requirementsSsc *2 Wiring standardElectrical work Cord. Code designation IEC60245 IEC 66 / CENELECH07RN-FIndoor and outdoor connection wiring Using 4poles ELCBEarth Leakage Circuit BreakerAP50M0 Series AP50M1 Series Using 3poles Elcb and 2poles ElcbConnecting the power terminal Electrical wiringInstallation procedures Installation methodOutdoor unit When using the anchor bolt When using the rubber legTrap FfRadius of curvature R on the oil trap are as follows Check the following list and install an oil trapRefrigerant pipe work Insulating the pipes Oil trapIt may cause explosion and injury Cut the pipe using the pipe cutterConnection of refrigerant piping Flare processing Remove burr on the edge of pipePipe bending Tightening of connection partsDrilling a hole in the wall Example Wall installation Corner InstallationDrain hose Fixing the indoor unitBe sure that all valve cocks are closed Air purgeHow to add refrigerant Refrigerant chargingCheck the stability of the pressure for 10 minutes Check and test operation CheckIs grounding properly made? Pump down procedure When removing the product When the outdoor temperature is below zero, do notTest operation Packing and unpacking guide Outdoor unit Tube How to connect your extended power cablesMm of the wire shields of the tube Prepare the following toolsApply heat to the contraction tube to contract it FfMethodMirageAP50M0@IBIMEN05323A-02.indd 2016-05-19 오후 English Questions or COMMENTS?