Step 2. Framing the Appliance

Appliance framing can be built before or after the appliance is set in place. Framing should be positioned to accommo- date wall coverings and appliance facing material. The dia- gram below shows framing reference dimensions.

CAUTION: MEASURE APPLIANCE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS BEFORE FRAMING.

VENT

FRAMING

HOLE

*The center of the framing hole is one (1) inch (25.4mm) above the center of the hori- zontal vent pipe.

The framing headers may rest on the appliance stand-offs.

E D *

Framing should be constructed of 2 X 4 lumber or heavier.

Models

A

B

C

D

E

SL-750TRS-IPI-D

42”

38 1/4”

16 1/4”

41”

27 7/8”

SL-550TRS-IPI-D

37”

33”

16 1/4”

36 1/2”

24 3/8”

SL-350TRS-C

34”

31”

16 1/4”

35 1/2”

22 3/8”

 

 

 

 

 

 

B

C

A

3”

WALL STUD

NON-COMBUSTIBLE ZONE

2-1/4”IS DEFINED BY 3” ABOVE THE ELBOW FOR THE ENTIRE

WIDTH AND DEPTH (BEHIND THE

FRONT HEADER) OF THE FIREBOX.

Figure 5. Framing Dimensions

Heat & Glo • SL-350TRS-C, SL-550/750TRS-IPI-D2065-985 Rev. J • 5/06

19

Image 19
Contents SL-750TRS-IPI-D SL-550TRS-IPI-D SL-350TRS-C Installation and OperationSafety and Warning Information Table of Contents SL-350TRS-C Log Set AssemblySL-350TRS-C NG, LP Service Parts ListStanding Pilot Ignition Valve AssemblySL-550TRS-IPI-D SL-550TRS-IPI-D Part number list on following Log Set AssemblySL-750TRS-IPI-D Intermittent Pilot Ignition Valve Assembly Service Parts SL-750TRS-IPI-D, SL-550TRS-IPI-DCertification High Altitude InstallationsInstallation Codes Appliance CertificationVent Directly BELOW. Keep Clear of ALL OB- Structions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Introducing the Heat & Glo Gas Appliances Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the SL-750TRS-IPI-D GAS Line Electrical Access Diagram of the SL-350TRS-C AccessLocating the Appliance Constructing the Appliance ChaseClearance Requirements Framing the Appliance Framing Dimensions34.93mm AT Each Joint 47 3/4 SL D-SERIES Components in ANY Vent Installing the Vent SystemSystem Configuration Identifying Vent ComponentsStraight UP Vertical Venting Flex VentWith TWO 900 Elbows Venting with One 90 Elbow Use SL D-Series components only Use DVP-Series Components onlyVenting with Two 90 Elbows Venting with TWO 2 90 o Elbows MAX. = 16 FT 4.8m + V 1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H MAX. = 40 FT 12.2m Venting with Four 90 elbows DVP Series Venting Only Go to Install FirestopsAttach the First Vent Component to the Starting Collars SL-D and SL-Flex Series Venting OnlyHole and Vent Pipe DVP, SL-D and SL-Flex Series VentingFor All Venting Vent TerminationSL-Series Venting Only For DVP Venting OnlyVent Termination Minimum Clearances Alcove ApplicationsMinimum Height from Roof to Lowest Discharge Opening Millivolt System Positioning, Leveling, and Securing the ApplianceGas Control Systems Standing Pilot Ignition SystemGas Pressure Requirements Gas Supply LinePressure Natural Gas Propane Wall Switch Wiring the ApplianceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesIntermittent Pilot Ignition IPI Wiring Diagram Operation using Battery PowerNER FinishingPositioning the Logs Installing the TrimShutter Settings Glass SpecificationsLighting the Appliance After the InstallationDouble-check for faulty components Before Lighting the ApplianceImportant Turn OFF the GAS Before Servicing Your Appliance Appliance Maintenance