TABLE OF CONTENTS |
| |
Safety and Warning Information | 2 | |
ÎService Parts Lists | 4 | |
Section 1: Approvals and Codes | 12 | |
Appliance Certification | 12 | |
Installation Codes | 12 | |
High Altitude Installations | 12 | |
Î Requirements for the Commonwealth of Massachusetts | 13 | |
Section 2: Getting Started | 14 | |
Introducing the Heat & Glo Gas Appliances | 14 | |
14 | ||
Section 3: Installing the Appliance | 18 | |
Constructing the Appliance Chase | 18 | |
Step 1 | Locating the Appliance | 18 |
Step 2 | Framing the Appliance | 19 |
Step 3 | Installing the Vent System | 22 |
| A. Vent System Approvals | 22 |
| B. Installing Vent Components | 32 |
| C. Vent Termination | 35 |
Step 4 | Positioning, Leveling, and |
|
| Securing the Appliance | 38 |
Step 5 | The Gas Control Systems | 38 |
Step 6 | The Gas Supply Line | 39 |
Step 7 | Gas Pressure Requirements | 39 |
Step 8 | Wiring the Appliance | 40 |
Step 9 | Finishing | 42 |
Step 10 | Installing Trim, Logs, and Ember Material | 43 |
| Installing the Trim | 43 |
| Positioning the Logs | 43 |
| Shutter Settings | 43 |
| Placing the Ember Material | 43 |
| Glass Specifications | 43 |
Step 11 Before Lighting the Appliance | 44 | |
Step 12 | Lighting the Appliance | 44 |
After the Installation | 44 | |
Section 4: Maintaining and Servicing Your Appliance | 45 | |
| Î= Contains updated information. |
|
Heat & Glo • | 3 |