STEP 4. Install Firestops

For Horizontal Runs - Firestops are REQUIRED on both sides of a combustible wall through which the vent passes.

NOTE: Model DVP-TRAP or SLK-01TRD does not need an exterior firestop on an exterior combustible wall.

To install firestops for horizontal runs that pass through either interior or exterior walls:

Cut a 12” x 10“ (305mm x 25mm) hole through the wall for DVP-series or a 10” x 10” (254mm x 254mm) hole for SL-D- series pipe. The center of the framing hole is one (1) inch (25.4mm) above the center of the horizontal vent pipe.

Position the firestops on both sides of the hole previ- ously cut and secure the firestops with nails or screws.

The heat shields of the firestops MUST BE placed to- wards the top of the hole.

Continue the vent run through the firestops.

NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.

10"

(254mm)

1" (25.4 mm)

12"(DVP) or 10" (SL) (305mm or 254mm)

VENT PIPE

Figure 24. Hole and Vent Pipe

HEAT SHIELD

TRIM HEAT SHIELD IF TOO LONG, ADD TO SHIELD IF TOO SHORT

EXTERIOR

FIRESTOP

INTERIOR

FIRESTOP

Figure 25. Heat Shield, Interior & Exterior Firestops

For Vertical Runs - One ceiling firestop is REQUIRED at the hole in each ceiling through which the vent passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the verti- cal vent component.

Mark the ceiling to establish the centerpoint of the vent.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wir- ing or plumbing runs.

Reposition the appliance and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut a 10-inch X 10-inch (254mm X 254mm) hole through the ceiling, using the centerpoint previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.

10" (254mm)

10" (254mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

 

MEMBERS

 

CEILING

 

Figure 26. Hole & New Framing Members

34

Heat & Glo • SL-350TRS-C, SL-550/750TRS-IPI-D2065-985 Rev. J • 5/06

Image 34
Contents Installation and Operation SL-750TRS-IPI-D SL-550TRS-IPI-D SL-350TRS-CSafety and Warning Information Table of Contents Log Set Assembly SL-350TRS-CNG, LP Service Parts List SL-350TRS-CValve Assembly Standing Pilot IgnitionSL-550TRS-IPI-D SL-550TRS-IPI-D Log Set Assembly Part number list on followingSL-750TRS-IPI-D Service Parts SL-750TRS-IPI-D, SL-550TRS-IPI-D Intermittent Pilot Ignition Valve AssemblyAppliance Certification High Altitude InstallationsInstallation Codes CertificationVent Directly BELOW. Keep Clear of ALL OB- Structions Requirements for the Commonwealth of MassachusettsManufacturer Requirements Introducing the Heat & Glo Gas Appliances Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the SL-750TRS-IPI-D GAS Line Electrical Access Access Diagram of the SL-350TRS-CLocating the Appliance Constructing the Appliance ChaseClearance Requirements Framing Dimensions Framing the Appliance34.93mm AT Each Joint 47 3/4 Identifying Vent Components Installing the Vent SystemSystem Configuration SL D-SERIES Components in ANY VentStraight UP Vertical Venting Flex VentWith TWO 900 Elbows Use DVP-Series Components only Venting with One 90 Elbow Use SL D-Series components onlyVenting with Two 90 Elbows Venting with TWO 2 90 o Elbows MAX. = 16 FT 4.8m + V 1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H MAX. = 40 FT 12.2m Venting with Four 90 elbows Go to Install Firestops DVP Series Venting OnlySL-D and SL-Flex Series Venting Only Attach the First Vent Component to the Starting CollarsDVP, SL-D and SL-Flex Series Venting Hole and Vent PipeFor DVP Venting Only Vent TerminationSL-Series Venting Only For All VentingAlcove Applications Vent Termination Minimum ClearancesMinimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Positioning, Leveling, and Securing the ApplianceGas Control Systems Millivolt SystemGas Pressure Requirements Gas Supply LinePressure Natural Gas Propane Optional Accessories Wiring the ApplianceFor Standing Pilot Ignition Wiring Appliance Requirements Wall SwitchOperation using Battery Power Intermittent Pilot Ignition IPI Wiring DiagramFinishing NERGlass Specifications Installing the TrimShutter Settings Positioning the LogsBefore Lighting the Appliance After the InstallationDouble-check for faulty components Lighting the ApplianceAppliance Maintenance Important Turn OFF the GAS Before Servicing Your Appliance