Flex Vent

The flex vent must be supported with the spacing between support intervals not exceeding 4 feet, with no more than ½ inch sag between supports.

A support is required at each change in venting direction, and in any location where it is necessary to maintain the necessary clearance to combustibles. A simple “up and out” installation (Figure 9) requires only enough support to main- tain the necessary clearance to combustibles. However, the vent attachment point and the firestop location are consid- ered to be supports.

STRAIGHT UP

VERTICAL VENTING

V(FT.) 45' MAX.

NOTE: For vertical venting over 20 feet a restrictor plate is recommended for improved flame appearance.

CAP

V

3” CLEARANCE

FLEX-VENT

TERMINATION

CAP

1”

CLEARANCE

Use SL D-Series components only.

Figure 10.

Figure 9.

Straight up Vertical Venting

STRAIGHT OUT HORIZONTAL VENTING

H

Max. Run

36" (914 mm)

WITH TWO 900 ELBOWS

90-DEGREE ELBOWS

 

Use two 900 elbows for corner installations.

 

 

The use of two 900 elbows in a corner installa-

H

tion will affect space requirements (see Fig.

4)

Figure 11. Straight Out Horizontal Venting

Use DVP-Series

components only.

Heat & Glo • SL-350TRS-C, SL-550/750TRS-IPI-D2065-985 Rev. J • 5/06

23

Image 23
Contents SL-750TRS-IPI-D SL-550TRS-IPI-D SL-350TRS-C Installation and OperationSafety and Warning Information Table of Contents SL-350TRS-C Log Set AssemblySL-350TRS-C NG, LP Service Parts ListStanding Pilot Ignition Valve AssemblySL-550TRS-IPI-D SL-550TRS-IPI-D Part number list on following Log Set AssemblySL-750TRS-IPI-D Intermittent Pilot Ignition Valve Assembly Service Parts SL-750TRS-IPI-D, SL-550TRS-IPI-DCertification High Altitude InstallationsInstallation Codes Appliance CertificationManufacturer Requirements Requirements for the Commonwealth of MassachusettsVent Directly BELOW. Keep Clear of ALL OB- Structions ANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Heat & Glo Gas Appliances Diagram of the SL-750TRS-IPI-D GAS Line Electrical Access Diagram of the SL-350TRS-C AccessClearance Requirements Constructing the Appliance ChaseLocating the Appliance Framing the Appliance Framing Dimensions34.93mm AT Each Joint 47 3/4 SL D-SERIES Components in ANY Vent Installing the Vent SystemSystem Configuration Identifying Vent ComponentsWith TWO 900 Elbows Flex VentStraight UP Vertical Venting Venting with One 90 Elbow Use SL D-Series components only Use DVP-Series Components onlyVenting with Two 90 Elbows Venting with TWO 2 90 o Elbows MAX. = 16 FT 4.8m + V 1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H MAX. = 40 FT 12.2m Venting with Four 90 elbows DVP Series Venting Only Go to Install FirestopsAttach the First Vent Component to the Starting Collars SL-D and SL-Flex Series Venting OnlyHole and Vent Pipe DVP, SL-D and SL-Flex Series VentingFor All Venting Vent TerminationSL-Series Venting Only For DVP Venting OnlyVent Termination Minimum Clearances Alcove ApplicationsMinimum Height from Roof to Lowest Discharge Opening Millivolt System Positioning, Leveling, and Securing the ApplianceGas Control Systems Standing Pilot Ignition SystemPressure Natural Gas Propane Gas Supply LineGas Pressure Requirements Wall Switch Wiring the ApplianceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesIntermittent Pilot Ignition IPI Wiring Diagram Operation using Battery PowerNER FinishingPositioning the Logs Installing the TrimShutter Settings Glass SpecificationsLighting the Appliance After the InstallationDouble-check for faulty components Before Lighting the ApplianceImportant Turn OFF the GAS Before Servicing Your Appliance Appliance Maintenance