Heat & Glo LifeStyle SL-750TRS-IPI-D + H 1 MAX. = 16 FT 4.8m + V 1 + H + H MAX. = 40 FT 12.2m

Page 30

VENTING WITH THREE (3) 90o ELBOWS

NATURAL GAS

 

MODEL SL-550TRS-D

MODEL SL-750TRS-D

V (MIN.)

H + H1 (MAX.)

H + H1 (MAX.)

90o Elbow on Top

2 FT (610mm)

2 FT (610mm)

1 FT (305mm)

3 FT (914mm)

3 FT (914mm)

2 FT (610mm)

4 FT (1.22m)

4 FT (1.22m)

3 FT (914mm)

6 FT (1.86m)

6 FT (1.86m)

4 FT (1.22m)

8 FT (2.48m)

8 FT (2.48m)

5 FT (1.52m)

16 FT (4.8m)

16 FT (4.8m)

H + H1 MAX. = 16 FT (4.8m)

V + V1 + H + H1

MAX. = 40 FT (12.2m)

 

 

 

 

VENTING WITH THREE (3) 90o ELBOWS

PROPANE

 

MODEL SL-550TRS-D

MODEL SL-750TRS-D

V (MIN.)

H + H1 (MAX.)

H + H1 (MAX.)

90o Elbow on Top

NOTALLOWED

NOTALLOWED

1 FT (305mm)

2 FT (610mm)

2 FT (610mm)

2 FT (610mm)

4 FT (1.22m)

4 FT (1.22m)

3 FT (914mm)

6 FT (1.86m)

6 FT (1.86m)

4 FT (1.22m)

8 FT (2.48m)

8 FT (2.48m)

5 FT (1.52m)

16 FT (4.8m)

16 FT (4.8m)

H + H1 MAX. = 16 FT (4.8m)

V + V1 + H + H1 MAX. = 40 FT (12.2m)

 

 

 

 

V1

V

H1

H

NOTE: There MUST be a 25% reduction in total H when using flex vent except when using the simple up and out installa- tion (see Figure 9).

Use SL D-Series components only.

Figure 19. Venting with three 90° elbows

30

Heat & Glo • SL-350TRS-C, SL-550/750TRS-IPI-D2065-985 Rev. J • 5/06

Image 30
Contents Installation and Operation SL-750TRS-IPI-D SL-550TRS-IPI-D SL-350TRS-CSafety and Warning Information Table of Contents Log Set Assembly SL-350TRS-CNG, LP Service Parts List SL-350TRS-CValve Assembly Standing Pilot IgnitionSL-550TRS-IPI-D SL-550TRS-IPI-D Log Set Assembly Part number list on followingSL-750TRS-IPI-D Service Parts SL-750TRS-IPI-D, SL-550TRS-IPI-D Intermittent Pilot Ignition Valve AssemblyAppliance Certification High Altitude InstallationsInstallation Codes CertificationRequirements for the Commonwealth of Massachusetts Vent Directly BELOW. Keep Clear of ALL OB- StructionsManufacturer Requirements Pre-install Preparation Introducing the Heat & Glo Gas AppliancesANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the SL-750TRS-IPI-D GAS Line Electrical Access Access Diagram of the SL-350TRS-CConstructing the Appliance Chase Locating the ApplianceClearance Requirements Framing Dimensions Framing the Appliance34.93mm AT Each Joint 47 3/4 Identifying Vent Components Installing the Vent SystemSystem Configuration SL D-SERIES Components in ANY VentFlex Vent Straight UP Vertical VentingWith TWO 900 Elbows Use DVP-Series Components only Venting with One 90 Elbow Use SL D-Series components onlyVenting with Two 90 Elbows Venting with TWO 2 90 o Elbows MAX. = 16 FT 4.8m + V 1 + H MAX. = 40 FT 12.2m Venting with Three 90 elbows Venting with Three 3 90 o Elbows + H 1 MAX. = 16 FT 4.8m + V 1 + H + H MAX. = 40 FT 12.2m Venting with Four 90 elbows Go to Install Firestops DVP Series Venting OnlySL-D and SL-Flex Series Venting Only Attach the First Vent Component to the Starting CollarsDVP, SL-D and SL-Flex Series Venting Hole and Vent PipeFor DVP Venting Only Vent TerminationSL-Series Venting Only For All VentingAlcove Applications Vent Termination Minimum ClearancesMinimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Positioning, Leveling, and Securing the ApplianceGas Control Systems Millivolt SystemGas Supply Line Gas Pressure RequirementsPressure Natural Gas Propane Optional Accessories Wiring the ApplianceFor Standing Pilot Ignition Wiring Appliance Requirements Wall SwitchOperation using Battery Power Intermittent Pilot Ignition IPI Wiring DiagramFinishing NERGlass Specifications Installing the TrimShutter Settings Positioning the LogsBefore Lighting the Appliance After the InstallationDouble-check for faulty components Lighting the ApplianceAppliance Maintenance Important Turn OFF the GAS Before Servicing Your Appliance