FireplaceXtrordinair 44 DV XXL EF manual Facing Example Facing Over 1 Thick, Arched Faces

Page 27

 

Installation (for qualified installers only)

2 7

Facing Example – Facing Over 1” Thick

 

 

Arched Faces:

For facing material over 1" thick (e.g. brick, river rock), install the facing around the

 

 

 

perimeter of the set-up face shipped with the fireplace. See the illustration below.

 

 

Rectangular Faces: For facing material over 1” thick (e.g. brick, river rock), install the facing material with a 1/8” gap to side side of the face and 3/8” gap along the top of the face (for face installation). Use the face being installed to create a form to support the facing as it is being installed.

Top

1” Stand-off

Fireplace

1"

Brick

Faceplate 1/8”

Non-Combustible Facing (cement board)

NOTE: a 3/8” gap is required along the top of the face for architectural faces.

3-d View

The brick facing must meet the requirements listed under “Facing Requirements”.

1”

Note: The brick tucks below the face template.

Set-Up Face

(shipped with the fireplace - 1/16” taller and 1/8” wider than the finished face)

Note: if using a brick hearth, the fireplace will need to be raised to accommodate the 1” gap betwen the face and the base of the fireplace. For 2-1/2” thick brick this works out to approximately 1-1/2” (we recommend 1-5/8” to accomodate irregular surfaces).

Travis Industries

4050114

1 0 0 - 0 1 1 4 9

Image 27
Contents DV XXL EF Manual Travis Industries 4050114 0 0 1 1 4 IntroductionIntroduction Important InformationSafety Precautions 4050114 0 0 1 1 4 Travis Industries If YOU Smell GASThis Manual Features and Specifications Features Installation OptionsHeating Specifications Natural Gas Propane Installation Warnings Packing ListAdditional Items Required Recommended Installation Procedure Installation OverviewMinimum Framing Dimensions Fireplace Placement RequirementsVertical Standoff ClearancesRaised Fireplaces Corner InstallationsGas Inlet Pressure Gas Line RequirementsFuel Gas Line ConnectionFireplace junction box Electrical ConnectionHorizontal Runs Vent RequirementsAltitude Considerations Part Numbers for 8 Diameter VentVertical Vent Requirements Vent InstallationMeasuring Vent Lengths Approved Vent ConfigurationsRestrictor Position ElbowsZero or Two 45 Offsets Four 45 Offsets Vertical Terminations with 0, 2, or 4 45 OffsetsHorizontal Terminations with One Vertical Elbow Horizontal Terminations with Three Vertical Elbows Vertical Terminations with Two Vertical 90 Elbows Termination Requirements see the illustration below Floor Mounted Fireplaces Hearth RequirementsMinimum Top Facing Clearance Facing RequirementsModifying the Face Angle for Rectangular Faces Face DimensionsFireplace Facing Detail Fireplace Facing Example Facing Under 1 ThickArched Faces Facing Example Facing Over 1 ThickMantel Requirements Combustible or Non-Combustible MantelsMinimum Mantel Clearance Arch Covers both sides Re-Attaching the Glass FrameGlass Frame Removal and Installation Place the Rear Log Place the Middle Logs Placing the Front Log Placing the Twigs Correct Arch Faces Architectural Faces Before You Begin Location of Controls See explanation below Operation3Starting The Pilot Flame 8OperationAdjusting the Flame Height Starting the Fireplace for the First TimeTurning the Fireplace On and Off Normal Operating Sounds Adjusting the Blower SpeedOptional Power Heat Duct 0OperationMaintaining Your Fireplaces Appearance Yearly Service ProcedureTroubleshooting Table MaintenanceHow this Fireplace Works What Turns the Main Burners On and OffWhat Prevents Gas Buildup Replacement Parts List Wiring DiagramFireplace Xtrordinair 44DVXXL Safety LabelYears 6 & 7 Coverage Parts only 6Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 3 Through 5 Coverage Parts & LaborLP Conversion Instructions Burner ReplacementOptional Equipment for qualified installers only Orifice Identification Power Heat Duct Wall or Ceiling Mounting Optional Equipment for qualified installers only Wiring Diagram Follow the directions below to wire the blower box Maintenance Instructions Modulating Remote Installation6Index