Installation (for qualified installers only)

Clearances

When installed, walls in front of the fireplace must be a minimum 3-1/2" to the side of the faceplate.

Due to the high temperature, the heater should be located out of traffic and away from furniture and draperies.

Fireplace must be placed so the vents below and above the glass do not become blocked

Vertical Standoff

The vertical standoff above the fireplace must be erected prior to installation. See the illustration below for instructions.

The vertical standoff is shipped swiveled down. Rotate the standoff upwards into place.

Secure the standoff with the six screws.

1/4" Nutdriver

These lifting handles may be removed once the fireplace is in place.

7/16" Wrench

Nail or screw the fireplace to the floor through the holes on these brackets.

Travis Industries

4050114

1 0 0 - 0 1 1 4 9

Image 10
Contents DV XXL EF Manual Important Information IntroductionIntroduction Travis Industries 4050114 0 0 1 1 4Safety Precautions If YOU Smell GAS 4050114 0 0 1 1 4 Travis IndustriesThis Manual Features Installation Options Features and SpecificationsHeating Specifications Natural Gas Propane Packing List Installation WarningsAdditional Items Required Installation Overview Recommended Installation ProcedureFireplace Placement Requirements Minimum Framing DimensionsClearances Vertical StandoffCorner Installations Raised FireplacesGas Line Connection Gas Line RequirementsFuel Gas Inlet PressureElectrical Connection Fireplace junction boxPart Numbers for 8 Diameter Vent Vent RequirementsAltitude Considerations Horizontal RunsVent Installation Vertical Vent RequirementsElbows Approved Vent ConfigurationsRestrictor Position Measuring Vent LengthsVertical Terminations with 0, 2, or 4 45 Offsets Zero or Two 45 Offsets Four 45 OffsetsHorizontal Terminations with One Vertical Elbow Horizontal Terminations with Three Vertical Elbows Vertical Terminations with Two Vertical 90 Elbows Termination Requirements see the illustration below Hearth Requirements Floor Mounted FireplacesFacing Requirements Minimum Top Facing ClearanceFace Dimensions Modifying the Face Angle for Rectangular FacesFireplace Facing Detail Facing Example Facing Under 1 Thick FireplaceFacing Example Facing Over 1 Thick Arched FacesCombustible or Non-Combustible Mantels Mantel RequirementsMinimum Mantel Clearance Re-Attaching the Glass Frame Arch Covers both sidesGlass Frame Removal and Installation Place the Rear Log Place the Middle Logs Placing the Front Log Placing the Twigs Correct Arch Faces Architectural Faces Operation3 Before You Begin Location of Controls See explanation below8Operation Starting The Pilot FlameStarting the Fireplace for the First Time Adjusting the Flame HeightTurning the Fireplace On and Off 0Operation Adjusting the Blower SpeedOptional Power Heat Duct Normal Operating SoundsYearly Service Procedure Maintaining Your Fireplaces AppearanceMaintenance Troubleshooting TableWhat Turns the Main Burners On and Off How this Fireplace WorksWhat Prevents Gas Buildup Wiring Diagram Replacement Parts ListSafety Label Fireplace Xtrordinair 44DVXXLYears 3 Through 5 Coverage Parts & Labor 6Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 6 & 7 Coverage Parts onlyBurner Replacement LP Conversion InstructionsOptional Equipment for qualified installers only Orifice Identification Power Heat Duct Wall or Ceiling Mounting Optional Equipment for qualified installers only Wiring Diagram Follow the directions below to wire the blower box Modulating Remote Installation Maintenance Instructions6Index