FireplaceXtrordinair 44 DV XXL EF manual Wall or Ceiling Mounting

Page 51

Optional Equipment (for qualified installers only) 5 1

2 Attach the blower box to the framing or floorboards of the home following the instructions below.

Wall or Ceiling Mounting

a

Cut a hole between wall

b

Attach the wall mounting

c

Slide the blower, with

framing members for the

brackets to the blower box.

wires, into the hole cut

 

blower assembly.

 

 

 

in step "a". Attach

 

 

 

 

 

with four screws.

5-1/4"

16"*

Mount the bracket to these holes for 2 x 4 walls

Mount the bracket to these holes for 2 x 6 walls

* This blower was designed for framing on 16" centers - construct additional framing if needed.

Floor Mounting

a

Cut a hole between floor joists

b

Attach the floor boot to the blower box with the included screws.

for the blower box.

 

 

 

 

The screws

 

 

 

attach to either

 

5-1/4"

 

of these pairs of

 

 

holes. Use the

 

14"

 

upper pair for

 

 

 

thick flooring, the

 

 

 

lower pair for

 

 

 

thin flooring.

Slide the blower into the hole c cut in step "a". Attach with four

screws.

Travis Industries

4050114

1 0 0 - 0 1 1 4 9

Image 51
Contents DV XXL EF Manual Travis Industries 4050114 0 0 1 1 4 IntroductionIntroduction Important InformationSafety Precautions 4050114 0 0 1 1 4 Travis Industries If YOU Smell GASThis Manual Features and Specifications Features Installation OptionsHeating Specifications Natural Gas Propane Installation Warnings Packing ListAdditional Items Required Recommended Installation Procedure Installation OverviewMinimum Framing Dimensions Fireplace Placement RequirementsVertical Standoff ClearancesRaised Fireplaces Corner InstallationsGas Inlet Pressure Gas Line RequirementsFuel Gas Line ConnectionFireplace junction box Electrical ConnectionHorizontal Runs Vent RequirementsAltitude Considerations Part Numbers for 8 Diameter VentVertical Vent Requirements Vent InstallationMeasuring Vent Lengths Approved Vent ConfigurationsRestrictor Position ElbowsZero or Two 45 Offsets Four 45 Offsets Vertical Terminations with 0, 2, or 4 45 OffsetsHorizontal Terminations with One Vertical Elbow Horizontal Terminations with Three Vertical Elbows Vertical Terminations with Two Vertical 90 Elbows Termination Requirements see the illustration below Floor Mounted Fireplaces Hearth RequirementsMinimum Top Facing Clearance Facing RequirementsModifying the Face Angle for Rectangular Faces Face DimensionsFireplace Facing Detail Fireplace Facing Example Facing Under 1 ThickArched Faces Facing Example Facing Over 1 ThickMantel Requirements Combustible or Non-Combustible MantelsMinimum Mantel Clearance Arch Covers both sides Re-Attaching the Glass FrameGlass Frame Removal and Installation Place the Rear Log Place the Middle Logs Placing the Front Log Placing the Twigs Correct Arch Faces Architectural Faces Before You Begin Location of Controls See explanation below Operation3Starting The Pilot Flame 8OperationAdjusting the Flame Height Starting the Fireplace for the First TimeTurning the Fireplace On and Off Normal Operating Sounds Adjusting the Blower SpeedOptional Power Heat Duct 0OperationMaintaining Your Fireplaces Appearance Yearly Service ProcedureTroubleshooting Table MaintenanceHow this Fireplace Works What Turns the Main Burners On and OffWhat Prevents Gas Buildup Replacement Parts List Wiring DiagramFireplace Xtrordinair 44DVXXL Safety LabelYears 6 & 7 Coverage Parts only 6Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 3 Through 5 Coverage Parts & LaborLP Conversion Instructions Burner ReplacementOptional Equipment for qualified installers only Orifice Identification Power Heat Duct Wall or Ceiling Mounting Optional Equipment for qualified installers only Wiring Diagram Follow the directions below to wire the blower box Maintenance Instructions Modulating Remote Installation6Index