FireplaceXtrordinair 44 DV XXL EF manual Follow the directions below to wire the blower box

Page 54
NOTE:Two junction boxes are included - use the best box for your installation.

5 4 Optional Equipment (for qualified installers only)

6 Follow the directions below to wire the blower box.

a

Remove the cover from

 

the blower box.

Phillips

Screwdriver

b

Standard

Screwdriver

Insert sheathed cable through the cable clamp. After the wires have been connected tighten the clamp to secure the cable.

c

Attach the hot (black) and common (white) wires to the

leads coming from the wires (use wire nuts).

Secure the ground wire to the ground stud inside the d blower box by tightening the included nut over the

ground wire. Re-attach the cover removed in step "a".

Ground Wire

7Follow the directions below to wire the rheostat. NOTE: There are two types of junction boxes, use the appropriate junction box for your installation.

Force the sheathed cable through a one of the locking flaps on the

junction box (repeat for the other cable). Some force is needed. The flap will lock the cable in place.

From

Blower Box

Attach the common (white) wires b together. Attach the ground

(exposed or green) wires together. Then attach each of the hot (black) wires from the cables to the two wires on the rheostat (orientation does not matter). Carefully pack the wires into the junction box.

Attach the cover plate

c (either white or beige) with the included screws. Slide the knob (either white or beige) over the rheostat shaft.

Standard

Screwdriver

To

Fireplace

Travis Industries

4050114

1 0 0 - 0 1 1 4 9

Image 54
Contents DV XXL EF Manual Important Information IntroductionIntroduction Travis Industries 4050114 0 0 1 1 4Safety Precautions If YOU Smell GAS 4050114 0 0 1 1 4 Travis IndustriesThis Manual Features and Specifications Features Installation OptionsHeating Specifications Natural Gas Propane Installation Warnings Packing ListAdditional Items Required Installation Overview Recommended Installation ProcedureFireplace Placement Requirements Minimum Framing DimensionsClearances Vertical StandoffCorner Installations Raised FireplacesGas Line Connection Gas Line RequirementsFuel Gas Inlet PressureElectrical Connection Fireplace junction boxPart Numbers for 8 Diameter Vent Vent RequirementsAltitude Considerations Horizontal RunsVent Installation Vertical Vent RequirementsElbows Approved Vent ConfigurationsRestrictor Position Measuring Vent LengthsVertical Terminations with 0, 2, or 4 45 Offsets Zero or Two 45 Offsets Four 45 OffsetsHorizontal Terminations with One Vertical Elbow Horizontal Terminations with Three Vertical Elbows Vertical Terminations with Two Vertical 90 Elbows Termination Requirements see the illustration below Hearth Requirements Floor Mounted FireplacesFacing Requirements Minimum Top Facing ClearanceFace Dimensions Modifying the Face Angle for Rectangular FacesFireplace Facing Detail Facing Example Facing Under 1 Thick FireplaceFacing Example Facing Over 1 Thick Arched FacesMantel Requirements Combustible or Non-Combustible MantelsMinimum Mantel Clearance Re-Attaching the Glass Frame Arch Covers both sidesGlass Frame Removal and Installation Place the Rear Log Place the Middle Logs Placing the Front Log Placing the Twigs Correct Arch Faces Architectural Faces Operation3 Before You Begin Location of Controls See explanation below8Operation Starting The Pilot FlameAdjusting the Flame Height Starting the Fireplace for the First TimeTurning the Fireplace On and Off 0Operation Adjusting the Blower SpeedOptional Power Heat Duct Normal Operating SoundsYearly Service Procedure Maintaining Your Fireplaces AppearanceMaintenance Troubleshooting TableHow this Fireplace Works What Turns the Main Burners On and OffWhat Prevents Gas Buildup Wiring Diagram Replacement Parts ListSafety Label Fireplace Xtrordinair 44DVXXLYears 3 Through 5 Coverage Parts & Labor 6Limited 7 Year WarrantyYears 1 & 2 Coverage Parts & Labor Years 6 & 7 Coverage Parts onlyBurner Replacement LP Conversion InstructionsOptional Equipment for qualified installers only Orifice Identification Power Heat Duct Wall or Ceiling Mounting Optional Equipment for qualified installers only Wiring Diagram Follow the directions below to wire the blower box Modulating Remote Installation Maintenance Instructions6Index