Regency L676 installation manual Rigid Pipe Venting Systems, Installation

Page 16

INSTALLATION

RIGID PIPE VENTING SYSTEMS

BASIC HORIZONTAL & VERTICAL TERMINATIONS

INSTALLATION

Rigid Pipe Vent Systems offer a complete line of component parts for installation of both horizontal and vertical installations. Many items are offered in decorative black, as well as gal- vanized fi nish.

The minimum components required for a basic horizontal termination are:

1Horizontal Termination Cap

190o Elbow

1Rigid Pipe Adaptor

1Wall Thimble

1Length of pipe to suit wall thickness

The minimum components required for a basic vertical termination are:

1Vertical Termination Cap

1Rigid Pipe Adaptor

1Lengths of pipe to adequately penetrate roof

1Ceiling Firestop

1Flashing

1Storm Collar

Wall thickness is measured from the back standoffs to the inside mounting surface of termination cap. For siding other than vinyl furring strips may be used, instead of the vinyl siding standoff, to create a level surface to mount the vent terminal. The Terminal must not be recessed into siding. Measure the wall thickness including furring strips.

If a Vinyl Siding Standoff is required (it must be used with vinyl siding), measure to outside surface of wall without siding and add 2 inches.

Vertical Terminal

 

Storm Collar

 

 

Vinyl Siding

Flashing

Standoff (Optional)

Vent Guard - if required*

 

 

(Part #946-506/P)

AstroCap XL

Ceiling FirestopTermination Cap

(Part #946-623/P)

Wall Thimble

(Mandatory in all

Horizontal Terminations)

Pipe Length

Adj.Pipe Length

 

 

11" - 14-5/8"

 

90o Elbow

24”

Pipe

Length

Rigid Pipe

Adapter

(770-994)

* A Vent Guard is required when the AstroCap is installed above grade at 7 feet or lower.

Alternate

Horizontal Termination

Caps

WARNING:

Do not combine venting components from different venting systems.

Use of the the AstroCap XLTM is acceptable with all systems.

This product has been evaluated by Intertek for using a Rigid Pipe Adaptor in conjunction with Duravent Direct-Vent GS and Selkirk Direct- Temp systems. Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing of components.

IMPORTANT NOTE

The Simpson Dura-Vent and Selkirk Direct Temp horizontal termination caps cannot be used in any applications.

Only the AstroCap XL and Snorkels are certified for horizontal terminations.

When using Rigid Vent other than

Simpson Dura-Vent, 3 screws must be used to secure rigid pipe to adaptor.

The FPI AstroCap XLTM is certifi ed for installations using FPI venting systems as well as Simpson Dura-Vent®Direct Vent GS and Selkirk Direct-Temp. AstroCap XLTM is a proprietary trademark of FPI Fireplace Products International Ltd. Dura-Vent® and Direct Vent GS are registered and/or proprietary trademarks of Simpson Dura-Vent Co. Inc.

16

Regency® L676 Direct Vent Gas Fireplace

Image 16
Contents Libertytm L676 Gas Fireplace Manufactured Mobile Home Requirements Table of Contents Safety Label Copy of Safety DecalRequirements MA Code CO DetectorUnit Dimensions Installation General Safety InformationInstallation Checklist Important Message Save These InstructionsHeat Release KIT Hearth RequirementsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceClearances Mantel Clearances Mantel LEG ClearancesFraming & Finishing Important Header must be metal studUnit Assembly Prior to InstallationVenting Introduction Vent Restrictor PositionFactory set for NG units Factory set for LP unitsExterior Vent Termination Requirements Venting Arrangements FPI Kit # Length ContainsInstallation Rigid Pipe Venting Systems8 Rigid Pipe Cross Reference Chart 58DVA-16ABL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Horizontal Venting with Two 2 90o Elbows Vertical Venting with Two 2 90o Elbows Vent must be supported at offsets Feet HeightUnit Installation with Horizontal Termination Unit Installation With Vertical Termination This allows for small adjustmentsDiagram Minimum VentUnit Installation Horizontal Termination with Flex Vent SystemGAS Line BACK-UP Battery Installation Hinge Door Heat Shield Power ModulePower Module Heat Shield Latch LocationConversion KIT #521-969 from NG to LP Pilot ShieldHeat Using a flat head screw driverClip Heat Shield J9 Jumper Location J9 JumperHeat Shield Front Burner Bracket Heat Shield Front Burner RemovedHinge Door Rear Log Stand GrateModulating Coil Wires Bottom Brick PanelHeat Shield Bracket Heat ShieldClip Pilot ShieldCable Tie Brick Panel Installation Handle with care. do not Force Into PositionOuterbox of Firebox Bracket Brick Panel Clip Tab Base Brick Panel SlotRear Burner Tube Front Burner Tube LOG SET InstallationBackside of Grate Complete Log Set Installation Aeration Adjustment Wiring DiagramLighting Procedure Operating InstructionsMatching Remote Handset & Control BOX ID Code Operating InstructionsOperation During Power Outage Shutdown ProcedureNormal Operating Sounds GAS Appliances GAS Control Valve Copy of Lighting Plate InstructionsRight Side Exterior Brick Panel Heat ShieldMaintenance BACK-UP Battery Replacement Bracket Hinge Heat DoorPower Module Replacement Bracket Heat ShieldBracket Hinge Heat Control Module ReplacementControl Module Battery Cover DC Sparker ReplacementHeat Shield Replace the DC sparker Valve Tray Replacement Unplug the power sourceValve Carefully remove the bottom brick panelModulating coil Main Assembly Parts ListDescription Parts List Burner & LOG Assembly Parts List Parts List Parts List Warranty Warranty Limited LifetimeInstaller Please complete the following information