Regency L676 installation manual Unit Assembly, Prior to Installation

Page 12

INSTALLATION

UNIT ASSEMBLY

SIDE NAILING STRIPS

FINISHING TEMPLATE

INSTALLATION

PRIOR TO

INSTALLATION

The Top Facing Support, the Side Nailing Strips and the 2 Top Standoffs must be correctly positioned and attached to the top before unit is slipped into position.

TOP STANDOFF ASSEMBLY

The top standoffs are shipped in a fl at position and must be folded into shape and attached.

1)

Remove the standoffs from the fi replace

 

top.

2)

Take each standoff and bend into the correct

 

shape. Bend up at the bend lines until the

 

screw holes in the standoff and the pre-

 

punched screw holes on the fi replace top

 

line up.

3)

Attach the standoff securely to the top

 

with 2 screws per standoff (on opposite

The side nailing strips come attached to the unit. There are 3 plates, one on the top and bottom that can be folded out as required.

In order to maintain a clean face; the L676 allows for a 1/8” in overlap of fi nishing material, such as rock or tile, on both the left and right hand sides of the unit (top and bottom sides do not allow for an overlap), this overlap must not be exceeded or the glass door will no longer open properly.

Non-combustible wall board is installed up to the fl anges on all sides of the unit. When installing any additional facing material use the Finishing Template (included with the unit) to ensure that the fi nishing material does not exceed the allowable overlap.

The Finishing Template uses two magnets to attach itself to the fl ange on the left or right side of the unit (see diagram below). Install the facing material up to the outside edge (when facing the unit) of the fi nishing template. This template may be discarded after the facing material has been installed.

corners).

Side Nailing Strips shown folded out.

12

Regency® L676 Direct Vent Gas Fireplace

Image 12
Contents Libertytm L676 Gas Fireplace Manufactured Mobile Home Requirements Table of Contents Safety Label Copy of Safety DecalRequirements MA Code CO DetectorUnit Dimensions Installation General Safety InformationInstallation Checklist Important Message Save These InstructionsHeat Release KIT Hearth RequirementsManufactured Mobile Home Additional Requirements Locating Your GAS FireplaceClearances Mantel Clearances Mantel LEG ClearancesFraming & Finishing Important Header must be metal studUnit Assembly Prior to InstallationVenting Introduction Vent Restrictor PositionFactory set for NG units Factory set for LP unitsExterior Vent Termination Requirements Venting Arrangements FPI Kit # Length ContainsInstallation Rigid Pipe Venting Systems8 Rigid Pipe Cross Reference Chart 58DVA-16ABL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Horizontal Venting with Two 2 90o Elbows Vertical Venting with Two 2 90o Elbows Vent must be supported at offsets Feet HeightUnit Installation with Horizontal Termination Unit Installation With Vertical Termination This allows for small adjustmentsDiagram Minimum VentUnit Installation Horizontal Termination with Flex Vent SystemGAS Line BACK-UP Battery Installation Hinge Door Heat Shield Power ModulePower Module Heat Shield Latch LocationConversion KIT #521-969 from NG to LP Using a flat head screw driver Pilot ShieldHeatClip Heat Shield J9 Jumper Location J9 JumperHeat Shield Front Burner Bracket Heat Shield Front Burner RemovedHinge Door Rear Log Stand GrateModulating Coil Wires Bottom Brick PanelHeat Shield Bracket Heat ShieldPilot Shield ClipCable Tie Brick Panel Installation Handle with care. do not Force Into PositionOuterbox of Firebox Bracket Brick Panel Clip Tab Base Brick Panel SlotLOG SET Installation Rear Burner Tube Front Burner TubeBackside of Grate Complete Log Set Installation Aeration Adjustment Wiring DiagramLighting Procedure Operating InstructionsMatching Remote Handset & Control BOX ID Code Operating InstructionsShutdown Procedure Operation During Power OutageNormal Operating Sounds GAS Appliances GAS Control Valve Copy of Lighting Plate InstructionsRight Side Exterior Brick Panel Heat ShieldMaintenance BACK-UP Battery Replacement Bracket Hinge Heat DoorPower Module Replacement Bracket Heat ShieldControl Module Replacement Bracket Hinge HeatControl Module DC Sparker Replacement Battery CoverHeat Shield Replace the DC sparker Valve Tray Replacement Unplug the power sourceCarefully remove the bottom brick panel ValveModulating coil Parts List Main AssemblyDescription Parts List Burner & LOG Assembly Parts List Parts List Parts List Warranty Warranty Limited LifetimeInstaller Please complete the following information