Regency L676 installation manual Allowable Horizontal Terminations

Page 19

INSTALLATION

VENTING ARRANGEMENTS

ALLOWABLE HORIZONTAL TERMINATIONS

The diagram shows all allowable combinations of vertical runs with horizontal terminations, using one 90o two 45o elbows equal one 90o elbow).

Note: Must use optional rigid pipe adapter (Part# 770-994) when using Rigid Pipe Venting Systems.

VENT RESTRICTOR SETTING:

NG Units; Vent restrictor at Set 0 - factory set, no adjustment required unless otherwise indicated.

LP Units; Vent restrictor at Set 1 - factory set, no adjustment required unless otherwise indicated.

Refer to the "Vent Restrictor Position" section for details on how to change the vent restrictor to Set 1, Set 2 or Set 3 if required.

A vent guard maybe required as per local codes, refer to "Exterior Vent Termination Requirements" section for details.

Note: Regency® Direct Vent System (Flex) is only approved for horizontal terminations.

Maintain clearances to combustibles as listed in "Clearances" section

Horizontal vent must be supported every 3 feet.

Firestops are required at each floor level and whenever passing through a wall.

A wall thimble is mandatory for all horizontal terminations due to high temperatures.

INSTALLATION

Regency® L676 Direct Vent Gas Fireplace

19

Image 19
Contents Libertytm L676 Gas Fireplace Manufactured Mobile Home Requirements Table of Contents Copy of Safety Decal Safety LabelMA Code CO Detector RequirementsUnit Dimensions Important Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistLocating Your GAS Fireplace Heat Release KITHearth Requirements Manufactured Mobile Home Additional RequirementsClearances Mantel LEG Clearances Mantel ClearancesImportant Header must be metal stud Framing & FinishingPrior to Installation Unit AssemblyFactory set for LP units Venting IntroductionVent Restrictor Position Factory set for NG unitsExterior Vent Termination Requirements FPI Kit # Length Contains Venting ArrangementsRigid Pipe Venting Systems Installation58DVA-16AB 8 Rigid Pipe Cross Reference ChartL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Horizontal Venting with Two 2 90o Elbows Vertical Venting with Two 2 90o Elbows Feet Height Vent must be supported at offsetsUnit Installation with Horizontal Termination Minimum Vent Unit Installation With Vertical TerminationThis allows for small adjustments DiagramHorizontal Termination with Flex Vent System Unit InstallationGAS Line Heat Shield Latch Location BACK-UP Battery InstallationHinge Door Heat Shield Power Module Power ModuleConversion KIT #521-969 from NG to LP Pilot ShieldHeat Using a flat head screw driverClip Heat Shield J9 Jumper J9 Jumper LocationRear Log Stand Grate Heat Shield Front BurnerBracket Heat Shield Front Burner Removed Hinge DoorBracket Heat Shield Modulating Coil WiresBottom Brick Panel Heat ShieldClip Pilot ShieldCable Tie Handle with care. do not Force Into Position Brick Panel InstallationBracket Brick Panel Clip Tab Base Brick Panel Slot Outerbox of FireboxRear Burner Tube Front Burner Tube LOG SET InstallationBackside of Grate Complete Log Set Installation Wiring Diagram Aeration AdjustmentOperating Instructions Lighting ProcedureOperating Instructions Matching Remote Handset & Control BOX ID CodeOperation During Power Outage Shutdown ProcedureNormal Operating Sounds GAS Appliances Heat Shield GAS Control ValveCopy of Lighting Plate Instructions Right Side Exterior Brick PanelMaintenance Bracket Hinge Heat Door BACK-UP Battery ReplacementBracket Heat Shield Power Module ReplacementBracket Hinge Heat Control Module ReplacementControl Module Battery Cover DC Sparker ReplacementHeat Shield Replace the DC sparker Unplug the power source Valve Tray ReplacementValve Carefully remove the bottom brick panelModulating coil Main Assembly Parts ListDescription Parts List Burner & LOG Assembly Parts List Parts List Parts List Warranty Limited Lifetime WarrantyInstaller Please complete the following information