Regency L676 installation manual Framing & Finishing, Important Header must be metal stud

Page 11

INSTALLATION

FRAMING & FINISHING

1)Frame in the enclosure for the unit with framing material. The framed

opening for the assembled kit is 45-7/8" high x 43" wide x 24-1/4" deep (1143mm x H 1092mm W x 616mm D). See Diagram 1. Also see Diagram 2 for corner installations.

IMPORTANT: Header must be metal stud.

INSTALLATION

Diagram 1

Diagram 2

Non-Combustible Requirements

Diagram 3

Note: When constructing the framed opening, please ensure there is access to install the gas lines when the unit is installed. See diagram 3 for details.

2)For exterior walls, insulate the enclosure to the same degree as the rest of the house, apply vapour barrier and drywall, as per local installation codes. (Do not insulate the fireplace itself.)

3)The unit does not have to be completely enclosed in a chase. You must maintain clearances from the vent to combustible materials: See "Clearances" section. Combustible materials can be laid against the side and back standoffs and the stove base.

IMPORTANT

If converting this unit to LP, it is highly recommened the conversion be done BEFORE the unit is slid into position for ease of conversion. See "Conversion from NG to LP" section for instructions.

Regency® L676 Direct Vent Gas Fireplace

11

Image 11
Contents Libertytm L676 Gas Fireplace Manufactured Mobile Home Requirements Table of Contents Copy of Safety Decal Safety LabelMA Code CO Detector RequirementsUnit Dimensions Important Message Save These Instructions InstallationGeneral Safety Information Installation ChecklistLocating Your GAS Fireplace Heat Release KITHearth Requirements Manufactured Mobile Home Additional RequirementsClearances Mantel LEG Clearances Mantel ClearancesImportant Header must be metal stud Framing & FinishingPrior to Installation Unit AssemblyFactory set for LP units Venting IntroductionVent Restrictor Position Factory set for NG unitsExterior Vent Termination Requirements FPI Kit # Length Contains Venting ArrangementsRigid Pipe Venting Systems Installation58DVA-16AB 8 Rigid Pipe Cross Reference ChartL676 & L900 Direct Vent Fireplace Allowable Horizontal Terminations Horizontal Venting with Two 2 90o Elbows Vertical Venting with Two 2 90o Elbows Feet Height Vent must be supported at offsetsUnit Installation with Horizontal Termination Minimum Vent Unit Installation With Vertical TerminationThis allows for small adjustments DiagramHorizontal Termination with Flex Vent System Unit InstallationGAS Line Heat Shield Latch Location BACK-UP Battery InstallationHinge Door Heat Shield Power Module Power ModuleConversion KIT #521-969 from NG to LP Clip Heat Shield Using a flat head screw driverPilot ShieldHeat J9 Jumper J9 Jumper LocationRear Log Stand Grate Heat Shield Front BurnerBracket Heat Shield Front Burner Removed Hinge DoorBracket Heat Shield Modulating Coil WiresBottom Brick Panel Heat ShieldCable Tie Pilot ShieldClip Handle with care. do not Force Into Position Brick Panel InstallationBracket Brick Panel Clip Tab Base Brick Panel Slot Outerbox of FireboxBackside of Grate LOG SET InstallationRear Burner Tube Front Burner Tube Complete Log Set Installation Wiring Diagram Aeration AdjustmentOperating Instructions Lighting ProcedureOperating Instructions Matching Remote Handset & Control BOX ID CodeNormal Operating Sounds GAS Appliances Shutdown ProcedureOperation During Power Outage Heat Shield GAS Control ValveCopy of Lighting Plate Instructions Right Side Exterior Brick PanelMaintenance Bracket Hinge Heat Door BACK-UP Battery ReplacementBracket Heat Shield Power Module ReplacementControl Module Control Module ReplacementBracket Hinge Heat Heat Shield Replace the DC sparker DC Sparker ReplacementBattery Cover Unplug the power source Valve Tray ReplacementModulating coil Carefully remove the bottom brick panelValve Description Parts ListMain Assembly Parts List Burner & LOG Assembly Parts List Parts List Parts List Warranty Limited Lifetime WarrantyInstaller Please complete the following information