Frymaster 47 Series operation manual National Code Requirements, Electrical Grounding Requirements

Page 10

One of the most important considerations of efficient fryer operation is ventilation. Make sure the fryer is installed so that products of combustion are removed efficiently, and that the kitchen ventilation system does not produce drafts that interfere with proper burner operation.

The fryer flue opening must not be placed close to the intake of the exhaust fan, and the fryer must never have its flue extended in a “chimney” fashion. An extended flue will change the combustion characteristics of the fryer, causing longer recovery time. It also frequently causes delayed ignition. To provide the airflow necessary for good combustion and burner operation, the areas surrounding the fryer front, sides, and rear must be kept clear and unobstructed.

Fryers must be installed in an area with an adequate air supply and adequate ventilation. Adequate distances must be maintained from the flue outlet of the fryer to the lower edge of the ventilation filter bank. Filters should be installed at an angle of 45º. Place a drip tray beneath the lowest edge of the filter. For U.S. installation, NFPA standard No. 96 states, “A minimum distance of 18 in. (450 mm) should be maintained between the flue outlet and the lower edge of the grease filter.” Frymaster recommends that the minimum distance be 24 in. (600 mm) from the flue outlet to the bottom edge of the filter.

Information on construction and installation of ventilating hoods can be found in the NFPA standard cited above. A copy of the standard may be obtained from the National Fire Protection Association, Battery March Park, Quincy, MA 02269.

DANGER

No structural material on the fryer should be altered or removed to accommodate placement of the fryer under a hood. Questions? Call the Frymaster/Dean Service Hotline at 1-800-551-8633.

DANGER

This appliance must be installed with sufficient ventilation to prevent the occurrence of unacceptable concentrations of substances harmful to the health of personnel in the room in which it is installed.

NATIONAL CODE REQUIREMENTS

The type of gas for which the fryer is equipped is stamped on the data plate attached to the inside of the fryer door. Connect a fryer stamped “NAT” only to natural gas, those stamped “PRO” only to propane gas, and those stamped “MFG” only to manufactured gas.

Installation shall be made with a gas connector that complies with national and local codes, and, where applicable, CE codes. Quick-disconnect devices, if used, shall likewise comply with national, local, and, if applicable, CE codes.

ELECTRICAL GROUNDING REQUIREMENTS

All electrically operated appliances must be grounded in accordance with all applicable national and local codes, and, where applicable, CE codes. A wiring diagram is located on the inside of the fryer door. Refer to the rating plate on the inside of the fryer door for proper voltages.

2-2

Image 10
Contents Hour Service Hotline Series Gas FryersCanada Page Series GAS Fryers Table of Contents Applicability and Validity Parts Ordering and Service InformationSeries GAS Fryers General Information Retain and Store this Manual in a Safe Place for Future USEEuropean Community CE Specific Information Safety InformationEquipment Description Installation, Operating, and Service Personnel DefinitionsShipping Damage Claim Procedure What to do if your equipment arrives damagedGeneral Installation Requirements Series GAS Fryers Installation InstructionsClearance and Ventilation National Code Requirements Electrical Grounding RequirementsCaster/Leg Installation FCC CompliancePage Non-CE Standard For Incoming Gas Pressures CE Standard For Incoming Gas PressuresCE Standard CE Standard Burner Manifold Gas Pressures Page Non-CE Gas Conversion Kits Robertshaw Gas Valves Converting to Another Gas TypeDual-Vat Honeywell Gas ValvesCE and Non-CE Gas Conversion Instructions Series GAS Fryers Operating Instructions Accessing the PilotLighting the Pilot on NON-EUROPEAN NON-CE Fryers Pilot Button OFF Button For units equipped with other than Thermostat Controls Placing the Fryer Into OperationFor units equipped with Thermostat Controls Boiling-Out the FrypotPage Controller Operation and Programming Series GAS Fryers Filtration Instructions Page Page Snap the Power Shower into the frypot Page Page Daily Checks and Services Series GAS Fryers Preventive MaintenanceFryer Preventive Maintenance Checks and Services Weekly Checks and ServicesDrain and Clean Frypot Quarterly Checks and ServicesClean Detachable Parts and Accessories Check Thermostat Controller Thermostat Calibration Clean Gas Valve Vent TubeCheck Computer Magic III Set Point Accuracy Check Burner Manifold Pressure SEMI-ANNUAL Checks and ServicesFryer Built-In Filtration System Page Series GAS Fryers Operator Troubleshooting IntroductionProblem Probable Causes Corrective Action Problem Troubleshooting Fryers with Thermostat ControlsProbable Causes Corrective Action Troubleshooting Abnormal Burner Operation Troubleshooting the Built-In Filtration SystemOr the transfer is Pump starts, but noTransfer takes place Very slowPower Shower is not Spraying properlyReplacing the Controller or Controller Wiring Harness This page Intentionally Left Blank Service Hotline