APC 600, 480, 208 manual Installation Procedures, Installation Procedure Overview

Page 11

Installation Procedures

Installation Procedure Overview

This section provides the basic steps to install the InfraStruXure power and rack components. Follow the references provided with each step for detailed instructions.

Warning: Do not begin installing your InfraStruXure system without an APC Field Service Engineer present.

Note: Search all boxes and packaging to make sure that they are empty before discarding.

1.Determine the correct placement of the system components by studying the InfraStruXure Configure-To-Order (CTO) report. Move the Symmetra PX UPS, InfraStruXure PDU, XR Battery Enclosure, and NetShelter VX Enclosures to their final location.

Warning: If installing InfraStruXure on a raised floor, make sure that the raised-floor structure has a in2/lb rating that will support the full weight of the InfraStruXure installation. See “Specifications” on page 41.

2.Level the PDU, UPS, NetShelter, and XR Battery Enclosures, using the 13/14-mm wrench included with each unit.

See “Level the PDU, UPS, NetShelter, and XR Battery Enclosures” on page 10 for detailed instructions.

3.Exchange side panels and run battery communication cables, if applicable. See “Exchange Side Panels” on page 11 for detailed instructions.

4.Join adjacent enclosures.

For instructions on joining the PDU, UPS, and XR Battery Enclosure see “Join the PDU, UPS, and XR Battery Enclosures” on page 13.

For instructions on joining adjacent NetShelter VX Enclosures, see the installation manual included with your enclosures.

5. Ensure total power off.

See “Total Power Off” on page 3 for detailed instructions.

InfraStruXure System - Installation and Start-Up

7

Image 11
Contents Installation and Start-Up About this Manual Contents Specifications Symbols used in this manual SafetyMaintenance performed while the PDU is receiving input power Installation/MaintenanceTotal Power Off EMI Emergency Power Off EPOSpace Considerations Site PlanningPage Installation Procedure Overview Installation ProceduresSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Attach conduit to the PDU for the input conductors Access the PDU Main Input switchConnect Utility Conductors to the PDU Input Voltage Circuit Breaker Amperage Install a circuit breakerConnect input conductors Route the input conductors to the Main Input switchGEC PDU Connect AC Power and Control WiringConnect control wiring Cascade XR Battery Enclosures Connect DC Power Wiring, if ApplicableXR Battery Enclosure Overview Connect an Emergency Power Off SwitchConnect an EPO switch to the user connection plate Overview Overhead Wiring Route and Attach Power Cables to the RacksFor single-feed devices within a Under Floor WiringInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Safety warnings Apply power to the systemHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Control Menu Verify UPS battery operationTop-Level Menu Start the UPS Verify proper voltage and phase rotation at the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Ensure that the Q2 circuit breaker on the PDU is closed on Power the PDU Distribution BreakersConfigure the InfraStruXure Manager Page KW InfraStruXure PDU SpecificationsPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 03/2008 APC Worldwide Customer Support990-1483C