APC 480, 208, 600 manual Specifications, KW InfraStruXure PDU

Page 45

Specifications

40 kW InfraStruXure PDU

Electrical

PD40F6FK1-M

PD40G6FK1-M

PD40L6FK1-M

 

 

 

 

Input

 

 

 

 

 

 

 

Nominal Voltage Requirements

208/120 V

480/277 V

600/346 V

Nominal Current

125 A

54 A

43 A

Frequency

57–63 Hz

57–63 Hz

57–63 Hz

Voltage Configuration

 

 

 

Transformer

3W + G + GEC

 

 

Without Transformer

4W + G

 

 

Upstream Circuit Breaker ††

175 AT

80 AT

60 AT

Main Input Conductor Size

3/0 AWG

#3 AWG

#4 AWG

UPS Breaker Size

175 AT

175 AT

175 AT

Maximum Continuous Current

155 A

67 A

54 A

Grounding

PE node (from AC or floor grid)

 

 

 

 

 

Output

 

 

 

 

 

 

 

Voltage AC

3-phase 4-wire PE

 

 

Nominal Voltage

208:120 V WYE

 

 

UPS Breaker Size

150 AT

150 AT

150 AT

Max. Distribution Breaker Size

150 AT

150 AT

150 AT

Number of Distribution Panels

2 × 225A, 42- position

 

Full Load Rating

40 kW

40 kW

40 kW

Max. Contin Current + 125% overload

139 A

139 A

139 A

Nominal Current

111 A

111 A

111 A

Internal Static Switch Fuses

175 A

 

 

Over-current Protection

 

 

 

PDU Current

Determined by UPS

 

 

Grounding

Separately derived neutral/ground bond

 

 

 

 

 

Wiring

 

 

 

 

 

 

 

UPS to PDU

3W + G (1/0 AWG)

 

 

PDU to Distribution Panels

4W + G (1/0 AWG)

 

 

Distribution Panels to Racks/Power Strips

4W + G (12 AWG)

 

 

Power Cable Connections

L21-20 connector system

 

 

 

 

 

InfraStruXure System - Installation and Start-Up

41

Image 45
Contents Installation and Start-Up About this Manual Contents Specifications Symbols used in this manual SafetyMaintenance performed while the PDU is receiving input power Installation/MaintenanceTotal Power Off EMI Emergency Power Off EPOSpace Considerations Site PlanningPage Installation Procedure Overview Installation ProceduresSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Access the PDU Main Input switch Connect Utility Conductors to the PDUAttach conduit to the PDU for the input conductors Input Voltage Circuit Breaker Amperage Install a circuit breakerConnect input conductors Route the input conductors to the Main Input switchGEC PDU Connect AC Power and Control WiringConnect control wiring Cascade XR Battery Enclosures Connect DC Power Wiring, if ApplicableXR Battery Enclosure Overview Connect an Emergency Power Off SwitchConnect an EPO switch to the user connection plate Overview Overhead Wiring Route and Attach Power Cables to the RacksFor single-feed devices within a Under Floor WiringInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Safety warnings Apply power to the systemHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Control Menu Verify UPS battery operationTop-Level Menu Start the UPS Verify proper voltage and phase rotation at the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Ensure that the Q2 circuit breaker on the PDU is closed on Power the PDU Distribution BreakersConfigure the InfraStruXure Manager Page KW InfraStruXure PDU SpecificationsPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental APC Worldwide Customer Support 990-1483C03/2008