APC 600, 480, 208 manual Verify proper voltage and phase rotation at the UPS, Start the UPS

Page 38

Start-Up Procedure: Apply power to the system

Verify proper voltage and phase rotation at the UPS

1. Close (turn ON) the Q1 circuit breaker on the PDU to apply power to the UPS.

2.Ensure A-B-C clockwise rotation at the UPS input terminal block, using a phase rotation meter.

3.Verify proper voltage is present at the UPS input terminal block (208V, metered phase-to-phase), using a true RMS voltmeter.

Start the UPS

1.Set the UPS DC Disconnect circuit breaker to ON, and then set the UPS System Enable switch to ON.

2.If applicable, set the XR Battery Enclosure DC Disconnect circuit breaker to ON.

When the System Enable switch is in the ON position, the Startup screen appears on the display interface of the Symmetra

PX UPS.

Then, the top-level status screen appears on the display interface. This may take up to 40 seconds.

px0013a

PowerView RM

Rev: 000 English

Please wait...

Fuel %

Load %

In 208V out000V 60Hz Runtime: 1hr 2m

34

InfraStruXure System - Installation and Start-Up

Image 38
Contents Installation and Start-Up About this Manual Contents Specifications Safety Symbols used in this manualInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPO EMISite Planning Space ConsiderationsPage Installation Procedures Installation Procedure OverviewSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Attach conduit to the PDU for the input conductors Access the PDU Main Input switchConnect Utility Conductors to the PDU Install a circuit breaker Input Voltage Circuit Breaker AmperageRoute the input conductors to the Main Input switch Connect input conductorsGEC Connect AC Power and Control Wiring PDUConnect control wiring Connect DC Power Wiring, if Applicable Cascade XR Battery EnclosuresXR Battery Enclosure Connect an Emergency Power Off Switch OverviewConnect an EPO switch to the user connection plate Overview Route and Attach Power Cables to the Racks Overhead WiringUnder Floor Wiring For single-feed devices within aInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Apply power to the system Safety warningsHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Verify UPS battery operation Control MenuTop-Level Menu Verify proper voltage and phase rotation at the UPS Start the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Power the PDU Distribution Breakers Ensure that the Q2 circuit breaker on the PDU is closed onConfigure the InfraStruXure Manager Page Specifications KW InfraStruXure PDUPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 03/2008 APC Worldwide Customer Support990-1483C