Start-Up Procedure: Apply power to the system

Verify bypass operation

1.Command the UPS into static bypass operation through the UPS display interface:

a.Press the ESC key to open the top-level menu.

b.Select Control on the top-level menu, and press the ENTER key.

c.Select UPS Into Bypass on the Control menu, and press the ENTER key.

d.On the next screen: select Yes, UPS into Bypass, and press the ENTER key.

The BYPASS LED illuminates and the following screens appear:

Top-Level Menu

 

 

 

 

 

 

Control

Logging

 

 

 

 

Status

Display

 

 

Setup

Diags

 

 

Accessories

Help

 

 

 

 

Control Menu

UPS Into Bypass

Do Self Test

Simulate Power Fail

Graceful Reboot

Graceful Turn Off

Start Runtime Cal

Turn Load On

Confirmation Screen

Confirm

Yes, UPS into Bypass No, Abort

UPS has been

commanded to go into Bypass...

UPS load is in Bypass

Press any key...

Note: The H3 LED above the Q3 circuit breaker illuminates, but do not operate the circuit breaker.

2.Use a true RMS voltmeter to make sure that there is no difference in potential between L1 IN and L1 OUT, L2 IN and L2 OUT, and L3 IN and L3 OUT on the Q3 circuit breaker. The Q3 circuit breaker must be in the OFF position. The top side of Q3 will be utility voltage and the bottom side of Q3 will be the voltage from the UPS in static bypass. Voltage should be less than 2 volts.

Note: Q3 is a 4-pole circuit breaker. Be sure to measure L1 to L1, L2 to L2, and L3 to L3.

36

InfraStruXure System - Installation and Start-Up

Image 40
Contents Installation and Start-Up About this Manual Contents Specifications Safety Symbols used in this manualInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPO EMISite Planning Space ConsiderationsPage Installation Procedures Installation Procedure OverviewSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Connect Utility Conductors to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Install a circuit breaker Input Voltage Circuit Breaker AmperageRoute the input conductors to the Main Input switch Connect input conductorsGEC Connect AC Power and Control Wiring PDUConnect control wiring Connect DC Power Wiring, if Applicable Cascade XR Battery EnclosuresXR Battery Enclosure Connect an Emergency Power Off Switch OverviewConnect an EPO switch to the user connection plate Overview Route and Attach Power Cables to the Racks Overhead WiringUnder Floor Wiring For single-feed devices within aInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Apply power to the system Safety warningsHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Verify UPS battery operation Control MenuTop-Level Menu Verify proper voltage and phase rotation at the UPS Start the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Power the PDU Distribution Breakers Ensure that the Q2 circuit breaker on the PDU is closed onConfigure the InfraStruXure Manager Page Specifications KW InfraStruXure PDUPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 990-1483C APC Worldwide Customer Support03/2008