APC 600, 480, 208 Route the input conductors to the Main Input switch, Connect input conductors

Page 20

Installation Procedures: Connect Utility Conductors to the PDU

Route the input conductors to the Main Input switch

For overhead wiring, run the input conductors directly to the Main Input switch.

For wiring under a raised floor, run the input conductors through the wireway () within the PDU to the Main Input switch.

Connect input conductors

Electrical Hazard: A licensed electrician must connect input conductors to the PDU!

Torque specs and tools required. Before connecting to the terminals, verify the torque specs below by checking the specifications on the Main Input switch.

Terminal

 

Torque

Tools

 

 

 

 

L1, L2, L3

 

150 in-lb

6-mm Allen wrench

N

 

125 in-lb

13-mm socket wrench

G, GEC

 

4–6 AWG: 45 in-lb

Slotted screwdriver

 

 

8 AWG: 40 in-lb

 

 

 

 

 

Only on PDUs without a transformer.

 

 

16

InfraStruXure System - Installation and Start-Up

Image 20
Contents Installation and Start-Up About this Manual Contents Specifications Safety Symbols used in this manualInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPO EMISite Planning Space ConsiderationsPage Installation Procedures Installation Procedure OverviewSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Attach conduit to the PDU for the input conductors Access the PDU Main Input switchConnect Utility Conductors to the PDU Install a circuit breaker Input Voltage Circuit Breaker AmperageRoute the input conductors to the Main Input switch Connect input conductorsGEC Connect AC Power and Control Wiring PDUConnect control wiring Connect DC Power Wiring, if Applicable Cascade XR Battery EnclosuresXR Battery Enclosure Connect an Emergency Power Off Switch OverviewConnect an EPO switch to the user connection plate Overview Route and Attach Power Cables to the Racks Overhead WiringUnder Floor Wiring For single-feed devices within aInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Apply power to the system Safety warningsHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Verify UPS battery operation Control MenuTop-Level Menu Verify proper voltage and phase rotation at the UPS Start the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Power the PDU Distribution Breakers Ensure that the Q2 circuit breaker on the PDU is closed onConfigure the InfraStruXure Manager Page Specifications KW InfraStruXure PDUPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 03/2008 APC Worldwide Customer Support990-1483C