APC 480, 208, 600 manual Contents

Page 3

Contents

Safety

1

IMPORTANT SAFETY INSTRUCTIONS

- SAVE THESE INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1

Symbols used in this manual . . . . . . . . . . . . . . . . . . . . . . . . 1

Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2

Installation/Maintenance

2

Maintenance performed while the PDU is receiving input power . 2

Total Power Off

3

DANGER—Risk of Electric Shock!

4

Emergency Power Off (EPO)

4

EMI

4

Site Planning

5

Space Considerations

. . . . . . . . .5

Installation Procedures

7

Installation Procedure Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7

Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Level the PDU, UPS, NetShelter, and XR Battery Enclosures. . . . .10 Exchange Side Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11

Exchange Side Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Connect Battery Enclosure communication cables

12

Join the PDU, UPS, and XR Battery Enclosures. . . . . . . . . . . . . . . .13 Connect Utility Conductors to the PDU. . . . . . . . . . . . . . . . . . . . . . .14

Access the PDU Main Input switch . . . . . . . . . . . . . . . . . . . 14

Attach conduit to the PDU for the input conductors . . . . . . . . 14

Install a circuit breaker . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Route the input conductors to the Main Input switch . . . . . . . 16

Connect input conductors . . . . . . . . . . . . . . . . . . . . . . . . . 16

Connect AC Power and Control Wiring. . . . . . . . . . . . . . . . . . . . . . .18

InfraStruXure System - Installation and Start-Up

i

Image 3
Contents Installation and Start-Up About this Manual Contents Specifications Symbols used in this manual SafetyMaintenance performed while the PDU is receiving input power Installation/MaintenanceTotal Power Off EMI Emergency Power Off EPOSpace Considerations Site PlanningPage Installation Procedure Overview Installation ProceduresSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Access the PDU Main Input switch Connect Utility Conductors to the PDUAttach conduit to the PDU for the input conductors Input Voltage Circuit Breaker Amperage Install a circuit breakerConnect input conductors Route the input conductors to the Main Input switchGEC PDU Connect AC Power and Control WiringConnect control wiring Cascade XR Battery Enclosures Connect DC Power Wiring, if ApplicableXR Battery Enclosure Overview Connect an Emergency Power Off SwitchConnect an EPO switch to the user connection plate Overview Overhead Wiring Route and Attach Power Cables to the RacksFor single-feed devices within a Under Floor WiringInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Safety warnings Apply power to the systemHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Control Menu Verify UPS battery operationTop-Level Menu Start the UPS Verify proper voltage and phase rotation at the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Ensure that the Q2 circuit breaker on the PDU is closed on Power the PDU Distribution BreakersConfigure the InfraStruXure Manager Page KW InfraStruXure PDU SpecificationsPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental APC Worldwide Customer Support 990-1483C03/2008
Related manuals
Manual 44 pages 48.45 Kb