APC 208, 480, 600 manual Specifications

Page 4

Connect DC Power Wiring, if Applicable . . . . . . . . . . . . . . . . . . . . . 20

Cascade XR Battery Enclosures . . . . . . . . . . . . . . . . . . . . . 20

Connect power cables from the XR Battery Enclosure to the

Symmetra PX UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

Connect an Emergency Power Off Switch . . . . . . . . . . . . . . . . . . . . 22

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Connect an EPO switch to the user connection plate . . . . . . . 23

Connect User Input Contacts and Relay Outputs to the

User Connection Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

Route and Attach Power Cables to the Racks . . . . . . . . . . . . . . . . . 25

Overhead Wiring

25

Under Floor Wiring

26

Route Data Cables to the InfraStruXure Manager Hub (or Switch) 28

Start-Up Procedure

29

Apply power to the system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Safety warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Verify UPS battery operation . . . . . . . . . . . . . . . . . . . . . . . 32

Verify proper voltage and phase rotation at the UPS . . . . . . . 34

Start the UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Verify bypass operation . . . . . . . . . . . . . . . . . . . . . . . . . . 36

Power the PDU Distribution Breakers . . . . . . . . . . . . . . . . . 38

Configure the InfraStruXure Manager . . . . . . . . . . . . . . . . . 39

Specifications

41

40 kW InfraStruXure PDU. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

ii

InfraStruXure System - Installation and Start-Up

Image 4
Contents Installation and Start-Up About this Manual Contents Specifications Safety Symbols used in this manualInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPO EMISite Planning Space ConsiderationsPage Installation Procedures Installation Procedure OverviewSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Connect Utility Conductors to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Install a circuit breaker Input Voltage Circuit Breaker AmperageRoute the input conductors to the Main Input switch Connect input conductorsGEC Connect AC Power and Control Wiring PDUConnect control wiring Connect DC Power Wiring, if Applicable Cascade XR Battery EnclosuresXR Battery Enclosure Connect an Emergency Power Off Switch OverviewConnect an EPO switch to the user connection plate Overview Route and Attach Power Cables to the Racks Overhead WiringUnder Floor Wiring For single-feed devices within aInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Apply power to the system Safety warningsHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Verify UPS battery operation Control MenuTop-Level Menu Verify proper voltage and phase rotation at the UPS Start the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Power the PDU Distribution Breakers Ensure that the Q2 circuit breaker on the PDU is closed onConfigure the InfraStruXure Manager Page Specifications KW InfraStruXure PDUPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 990-1483C APC Worldwide Customer Support03/2008