3.Read the messages displayed on the Symmetra PX UPS display interface. Note any alarms and verify that they are appropriate for start-up conditions.

4.Command the UPS to apply power to the load:

a.Press the ESC key to open the top-level menu.

b.Select Control, and press the ENTER key.

c.Select Turn Load On from the Control menu, and press the ENTER key.

d.On the next screen: select Yes, UPS Load ON, and press the ENTER key.

Start-Up Procedure: Apply power to the system

Top-Level Status Screen

Fuel %

Load %

In 208V out000V 60Hz

Runtime: 1hr 2m

Top-Level Menu

Control Logging

Status Display

Setup Diags

Accessories Help

Control Menu

UPS Into Bypass

Do Self Test

Simulate Power Fail

Graceful Reboot

Graceful Turn Off

Start Runtime Cal

Turn Load On

Confirmation Screen

Confirm

Yes, UPS Load ON

No, Abort

The interface will display the following screen:

The LOAD ON LED illuminates and the interface displays the following screen:

5. Close (turn ON) the Q2 circuit breaker on the PDU.

UPS has been

commanded to turn load power on...

UPS load is on

Press any key...

InfraStruXure System - Installation and Start-Up

35

Image 39
Contents Installation and Start-Up About this Manual Contents Specifications Symbols used in this manual SafetyMaintenance performed while the PDU is receiving input power Installation/MaintenanceTotal Power Off EMI Emergency Power Off EPOSpace Considerations Site PlanningPage Installation Procedure Overview Installation ProceduresSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Access the PDU Main Input switch Connect Utility Conductors to the PDUAttach conduit to the PDU for the input conductors Input Voltage Circuit Breaker Amperage Install a circuit breakerConnect input conductors Route the input conductors to the Main Input switchGEC PDU Connect AC Power and Control WiringConnect control wiring Cascade XR Battery Enclosures Connect DC Power Wiring, if ApplicableXR Battery Enclosure Overview Connect an Emergency Power Off SwitchConnect an EPO switch to the user connection plate Overview Overhead Wiring Route and Attach Power Cables to the RacksFor single-feed devices within a Under Floor WiringInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Safety warnings Apply power to the systemHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Control Menu Verify UPS battery operationTop-Level Menu Start the UPS Verify proper voltage and phase rotation at the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Ensure that the Q2 circuit breaker on the PDU is closed on Power the PDU Distribution BreakersConfigure the InfraStruXure Manager Page KW InfraStruXure PDU SpecificationsPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental APC Worldwide Customer Support 990-1483C03/2008