APC 208, 480, 600 manual PD40F6FK1-M PD40G6FK1-M PD40L6FK1-M

Page 46

Specifications: 40 kW InfraStruXure PDU

 

 

 

 

 

Electrical

PD40F6FK1-M PD40G6FK1-M

PD40L6FK1-M

 

 

 

 

 

 

 

Power Cable Lengths

various

 

 

 

 

Recommended Wire Sizing

 

 

 

 

 

L1, L2, L3, N

3/0 AWG

4 AWG

4AWG

 

G

6 AWG

8 AWG

8 AWG

 

GEC

4 AWG

4 AWG

4 AWG

 

Power Cable—top

Accommodates 28, 3-phase power cables (42 knockouts)

 

Power Cable—bottom

Accommodates 28, 3-phase power cables (48 knockouts)

 

 

 

 

 

 

 

Panel Boards

 

 

 

 

 

 

 

 

 

 

 

Panel Style

3-phase

 

 

 

 

Number of Panels per PDU

2 maximum

 

 

 

 

Positions per Panel

42

 

 

 

 

3-Phase Breakers per Panel

14 maximum

 

 

 

 

1-Phase Breakers per Panel

42 maximum

 

 

 

 

Panel Rating

240 V/225 A (per phase)

 

 

 

Breaker Pitch

3/4 in

 

 

 

 

Accessibility

Through front of the unit

 

 

 

 

 

 

 

 

 

Relay Outputs

 

 

 

 

 

 

 

 

 

 

 

Nominal Switching Capacity

1 A at 30 Vdc

 

 

 

 

Maximum Switching Power

30 W

 

 

 

 

Maximum Switching Voltage

60 Vdc

 

 

 

 

Maximum Switching Current

2 ADC

 

 

 

 

Maximum Carrying Current

2 ADC

 

 

 

 

Surge Ratings

2 kV per Bellcore TA-NWT-001089

 

 

 

 

1.5 kV per FCC part 68

 

 

 

 

 

 

 

 

 

Physical

PD40F6FK1-M

PD40G6FK1-M

PD40L6FK1-M

 

 

 

 

 

 

 

Dimensions (H×W×D)

 

 

 

 

 

PDU

81×24×36 in. (2057 × 610 × 914 mm)

 

 

 

Shipping

86 × 36 × 48 in (2184 × 914 × 1219 mm)

 

Weight

 

 

 

 

 

PDU

1580lb (718.18kg)

 

 

 

 

Shipping

1680lb (763.6kg)

 

 

 

 

Heat Output With Transformer

4645BTU

4617BTU

3425BTU

 

Transformer (if installed)

 

 

 

 

 

Type

Isolation

Step-down

Step-down

 

 

 

 

 

 

42

InfraStruXure System - Installation and Start-Up

Image 46
Contents Installation and Start-Up About this Manual Contents Specifications Safety Symbols used in this manualInstallation/Maintenance Maintenance performed while the PDU is receiving input powerTotal Power Off Emergency Power Off EPO EMISite Planning Space ConsiderationsPage Installation Procedures Installation Procedure OverviewSee Start-Up Procedure on page 29 for detailed instructions Tools Required Level the PDU, UPS, NetShelter, and XR Battery Enclosures Exchange Side Panels Exchange Side PanelsConnect Battery Enclosure communication cables Join the PDU, UPS, and XR Battery Enclosures Connect Utility Conductors to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Install a circuit breaker Input Voltage Circuit Breaker AmperageRoute the input conductors to the Main Input switch Connect input conductorsGEC Connect AC Power and Control Wiring PDUConnect control wiring Connect DC Power Wiring, if Applicable Cascade XR Battery EnclosuresXR Battery Enclosure Connect an Emergency Power Off Switch OverviewConnect an EPO switch to the user connection plate Overview Route and Attach Power Cables to the Racks Overhead WiringUnder Floor Wiring For single-feed devices within aInfraStruXure System Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub or Switch Apply power to the system Safety warningsHeavy Use two people to lift and install power modules Start-Up Procedure Apply power to the system Verify UPS battery operation Control MenuTop-Level Menu Verify proper voltage and phase rotation at the UPS Start the UPSFuel % Load % 208V out000V 60Hz Runtime 1hr 2m Verify bypass operation Confirm Yes, UPS into Bypass No, Abort Power the PDU Distribution Breakers Ensure that the Q2 circuit breaker on the PDU is closed onConfigure the InfraStruXure Manager Page Specifications KW InfraStruXure PDUPD40F6FK1-M PD40G6FK1-M PD40L6FK1-M Environmental 990-1483C APC Worldwide Customer Support03/2008
Related manuals
Manual 44 pages 48.45 Kb